- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
dk-1制动机考试假设故障(DK-1 brake fault hypothesis test)
dk-1制动机考试假设故障(DK-1 brake fault hypothesis test)
1, 117 cock (an electric discharge cutting train pipe cock) closed: emergency brake, pressure of train pipe, hands slightly moving total air cylinder; 94YV normal movement, and a row of wind.
2, (158 of total wind electric discharge cock cock closing): emergency brake, pressure of train pipe, air cylinder hands do not move; 94YV normal action, but not the wind.
3, 117 cock (leaked electric train pipe cutting off: half cock) emergency braking, train pipe exhaust brake cylinder slow, slower, but will eventually rise to constant pressure (this fault and 117 cocks severity).
4, the role of pipe plug: big brake brake, single slow brake, no exhaust, brake cylinder does not ease; big gate translocation, brake cylinder to ease the normal. The braking of the small brake will relieve the failure, but there will be a small amount of exhaust when it is relieved. If the volume chamber is blocked at the three pipe of the action tube, the size and gate are all out of control of the volume chamber.
5, (114 of total air cock cock relay): closed gate is braking, train decompression to normal, balanced air cylinder down to zero without exhaust wind; gate braking, train decompression normal; gate remised, not charging train pipe, total air cylinder hands do not move; brake cylinder buffer normal (254YV normal exhaust).
6, (114 of total air cock cock relay): half closed gate is braking, the train decompression is normal, ease, train pipe charging slow; gate braking, train decompression is normal, ease, train pipe charging slow; brake cylinder buffer normal (254YV normal exhaust).
7, 115 (relay of train pipe cock cock): closed gate is braking, train decompression normal, balanced air cylinder down to zero and a row of wind; gate relieved when not charging the train pipe; hand slightly moving note total air cylinder: Set 5, 7 after the fault once, after the experiment should be re set.
8, 115 (relay of train pipe cock cock): half closed gate
您可能关注的文档
- 2011年最近的设计比赛(包括平面、环艺、服装、产品等)(Most recently in 2011 Design Competition (including plane, environment art, clothing, etc.)).doc
- 2011年考研英语阅读理解新题型答案(沪江标准版)(Answer new questions in 2011 section of English reading comprehension (Shanghai Standard Edition)).doc
- 2011年自考精心整理的自考《中国近现代史纲要》资料 -自考-考试大2(In 2011, carefully compiled from the modern Chinese history outline information - self examination - examination 2).doc
- 2011年财务部个人年度工作总结(Personal annual work summary of finance department in 2011).doc
- 2011年轻人创业首选女装网店代理(2011 young people preferred women's clothing shop agent).doc
- 2011年福建省教师招聘考试《教育综合》公益模拟卷(2011 Fujian teacher recruitment examination education synthesis public welfare simulation volume).doc
- 2011年终个人销售工作总结范文(2011 end of the year personal sales work summary).doc
- 2011年高考生物(浙科版)第一轮复习精品课件第5单元 孟德尔定律 染色体...(2011 college entrance examination Biology (Zhejiang Edition) first round of review Courseware Fifth units, Mendel's law, chromosomes...).doc
- 2011年高考《理综》真题课标)(The college entrance examination in 2011 science Curriculum).).doc
- 2011年高考生物(浙科版)第一轮复习精品课件第5单元 孟德尔定律 染色体(2011 college entrance examination Biology (Zhejiang Edition) first round of review Courseware Fifth units, Mendel's law, chromosomes).doc
原创力文档


文档评论(0)