- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
The Power Flow Equations Iowa State University(爱荷华州立大学的功率流方程)
The DC Power Flow Equations
1.0 Introduction
Contingency analysis occurs within the EMS by assessing each
possible contingency (usually all N-1) one at a time. That is, we
start from a solved power flow case representing current conditions
(from the state estimator), then perform contingency assessment as
follows:
1. If all contingencies assessed, go to 5.
2. Go to next contingency, remove the element and re-solve the
power flow case,
3. Identify whether performance is acceptable or not by checking
for overloads and voltage out of limits;
o If unacceptable, identify preventive or corrective action
4. Go to (1)
5. End
For a 50,000 bus system, with perhaps 2000 contingencies to be
assessed (much lower than all N-1), if each powerflow re-solve
requires 10 seconds, we require about 5.5 hours on a sequential
computer. Of course, we may use parallelism on this problem very
effectively (e.g., 10 computers, with each assigned to perform 200
contingencies, will get the job done in about 33 minutes).
But what would be of most benefit is if we can reduce the time per
contingency to 0.1 seconds instead of 10. Then the sequential
computer requires only 3.3 minutes, and the 10 parallel computers
require only 20 seconds!
Therefore, in these notes we take a close look at the DC power
flow, because it is this method which forms the basis for obtaining
very fast answers in contingency assessment.
Some typical numbers as of 2007 are given below:
1
Org Scan # of SE EMS model size # of CA
rate msrments rate (# of buses) cont. rate
BPA 2 sec 5 min 6000 5 min
MISO 4 sec 120,000 90 s
您可能关注的文档
- The Nature of Creativity UNCW Faculty and (创造力的本质UNCW教职).pdf
- The Nature and Importance of Innovation(创新的本质和重要性).pdf
- The nature of credit risk in project finance(信用风险在项目融资的性质).pdf
- The Nature Of Earthquakes EOLSS(地震EOLSS的本质).pdf
- The Nature of Wind Loads and Dynamic Response(风载荷和动态响应的本质).pdf
- The Navajo Nation Division of Economic (纳瓦霍语国家的经济).pdf
- The Nature, Elements and Importance of (的性质、元素和重要性).pdf
- The NC Machining PostProcessing Technology (数控加工后处理技术).pdf
- The needed knowledge Generating numerous TRIZ(所需的知识生成许多相结合).pdf
- The Nestl233; Management and Leadership Principles(Nestl233;).pdf
- The Power of Now Personal development(现在个人发展的力量).pdf
- The Power of Storytelling to JumpStart (讲故事的力量来启动).pdf
- The Power of Thiolene Chemistry Hawker (Thiolene化学小贩的力量).pdf
- THE PRANDTL WING EngBrasil(普朗特翼EngBrasil).pdf
- The PredatorPrey Equations Pennsylvania (宾夕法尼亚州PredatorPrey方程).pdf
- The Pragmatics of Defining Religion in a Multi (语用学的定义在一个多宗教).pdf
- The premier source of parts and accessories for …(英超的零部件和配件来源u2026).pdf
- The Preferred Distributor for Gate Operators, (门的首选经销商运营商,).pdf
- The premier source of tooling, parts, and …(英超的工具、零件和u2026).pdf
- The Preparation and Analysis of a Coordination (一个协调的准备和分析).pdf
文档评论(0)