施工单位询价书(Inquiry Book of construction unit).docVIP

施工单位询价书(Inquiry Book of construction unit).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工单位询价书(Inquiry Book of construction unit)

施工单位询价书(Inquiry Book of construction unit) 2 * 600MW thermal power plant Construction and installation inquiry Project number: Xxxxxx A, General description 1. project name: 2 * 600MW thermal power plant 2. construction sites: 3. owners: 4. request time limit: tentatively started in March 1, 2012, completed in March 1, 2015. 5., contract way: according to approved budget estimate of construction unit cost float contract. 6. project overview: 35kV substation is located in the east of the town Nanbin Shizhu County in Chongqing, convenient transportation. 6.1 project scale: 7. scope of inquiry: 7.1 35kV substation main transformer #2 East extension line and substation project engineering design work (including communication, remote control, measurement, protection and debugging, all special test equipment, electric power test and Research Institute to send check equipment transport, unloading and engineering related coordination work); the station contains equipotential and electric installation complete installation related civil facilities associated with this variable. 7.3 complete the station related access to the project. 7.4 other work entrusted by the owner. 8., construction objectives: the project must reach the national Power Grid Corp power transmission project commissioning test (2005 Edition) (national grid, capital construction, [2005]255) assessment standards, put into production. 9. security: no personal injuries and above accident does not occur; the network equipment, fire accident of major and above; no major traffic accidents and over and above bear equal responsibility; the general accident does not occur directly responsible; not liable for the occurrence of outsourcing project of personal injuries and above accidents; no pollution accidents and major collapse (collapse) collapse accident. At the same time, the bid winning construction unit shall strictly implement the safety agreement signed with the owner, and strictly implement the new regulatio

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档