pcb电测技术分析(Analysis of PCB electrical measurement technology).docVIP

pcb电测技术分析(Analysis of PCB electrical measurement technology).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
pcb电测技术分析(Analysis of PCB electrical measurement technology)

pcb电测技术分析(Analysis of PCB electrical measurement technology) Analysis of PCB electrical measurement technology Published in the 2006-11-25 19:47:39 An electrical test The PCB board in the production process, not because of external factors caused by the defects of short circuit, open circuit and leakage power, coupled with the PCB evolving towards high density, fine pitch and multi-level, if not timely bad board screening, and allowed to flow into the process, will inevitably lead to more the cost of waste, so in addition to the improvement of process control, improve the testing technology for PCB manufacturing can also provide solutions to reduce the scrap rate and improve product yield. In the production process of electronic products, the cost of the loss caused by defects, have different degree in each stage, the earlier is the lower the cost of recovery. The Rule of 10s is an often used to evaluate PCB were found in the different stages of the process when there are flaws in the recovery cost. For example, the empty plate production is completed, if the circuit board can be detected in real time, usually only need to fill the line to improve the defect, or to loss of an empty plate; but if they failed to be detected to be shipped to the downstream circuit board assembly industry to complete the installation of components, but also a furnace tin and IR remelting. But it was detected in the case of line breaker at this time, the General Assembly will make to the downstream industry empty board manufacturing company for compensation cost of parts, heavy fees, inspection fees etc.. If more unfortunate, the flaws of the board in the assembly industry test has not yet been found, and the whole system into finished products, such as computer, mobile phone, car parts, then the test found that the loss will be empty in timely detection of hundreds of times, thousands of times, or even higher. Therefore, the electrical test for PCB manufacturers, as is the early detecti

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档