on precipitation in tube well pit construction(在管井降水井施工).docVIP

on precipitation in tube well pit construction(在管井降水井施工).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
on precipitation in tube well pit construction(在管井降水井施工)

On precipitation in tube well pit Construction Abstract: The high water table areas in the basic construction, dewatering, construction of infrastructure to provide a dry working environment is the key. This paper describes the precipitation tube well-based technology in the construction of a project application. Keywords: excavation, tube wells, precipitation 1 Project Overview and geological conditions A major project for the clay soil excavation, excavation slope of 1:3, according to the construction site above the actual situation, not to slope excavation shoring. Pit excavation to lower the key for the drainage, open digging, should reduce the water table to below the excavation surface 0.5m, non-disturbance natural foundation, reserve pit at the bottom 30cm thickness of the protective layer. foundation pit drainage ditches and tube wells mainly precipitation. Engineering Geology is divided into the lower three layers: the upper part of the artificial accumulation of fill-based, central part of the wavy red clay brick, the lower part of the bedrock to sandy conglomerate based. 2 Materials and equipment investment plans Well pipe: The concrete tube wells, well pipe diameter φ300mm, wall thickness of 50mm, the lower part of the precipitation for the 1.0m tube, the upper filter for the non-sand concrete pipe. Pumps: 2 sets of drainage ditches with mud 22kW, each deep wells within the configuration 1 sets 150QJ20-26 / 4 type deep well pump, a control switch for each pump configuration. 3 foundation pit construction ideas 3.1 General construction methods Excavation slope of 1:3, water content of soil material at this stage is moderate, the excavation pit directly in the second phase of excavation at 52.0m elevation using the following drainage ditches and the drainage tube wells, the second stage, from 52.0m The following elevation 52.0m height before excavation started to play deep in the cutoff wall construction of t

您可能关注的文档

文档评论(0)

wnqwwy20 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:7014141164000003

1亿VIP精品文档

相关文档