on prestressed box girder bridges continuous grouting pipes(在预应力连续箱梁桥梁注浆管道).docVIP

on prestressed box girder bridges continuous grouting pipes(在预应力连续箱梁桥梁注浆管道).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
on prestressed box girder bridges continuous grouting pipes(在预应力连续箱梁桥梁注浆管道)

On prestressed box girder bridges continuous grouting pipes [Abstract] prestressed bridge construction include: installation, tensioning, grouting three processes, installation of prestressed pore position control, tension and elongation values ??of Tension Control, grouting of the three density control prestressed construction quality is good or bad relationship a key factor in this paper focuses on the main bridge prestressed bridge grouting using vacuum grouting pipeline construction technology and precautions are discussed. [Keywords] prestressed pipe, vacuum grouting, construction technology, quality control In bonded post-tensioned prestressed concrete structures, prestressed reinforcement corrosion problems and work together with the structural concrete is filled by pressure grouting and prestressing tendons embedded in the pore space between the tendon to be resolved, When the post-tensioning tendons at the level of non-tilted state, multi-span bending state and the vertical state, the slurry formed after evaporation of bleeding water slurry existence of space, so that it loses the protection of the prestressing tendons, while prestressed tendons under high stress (modern prestressed structures, tendons stress state is usually more than 1000MPa very sensitive to corrosion damage (ie, stress corrosion, corrosion of prestressing tendons caused by defects in cross-section area, affecting the safety and prestressed concrete structures durability, so grouting quality directly affects the tendons of the anti-corrosion, safety performance of prestressed structures and durability. The traditional means of pressure grouting, grouting, slurry and construction process itself, with certain limitations nature, mainly as follows: Central Standing Committee of slurry poured into the air bubbles, when the mixture hardened, the Department will keep the plot bubbles into the pores, the accumulation of rainwater infiltration into the ground, the water may contain

您可能关注的文档

文档评论(0)

wnqwwy20 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:7014141164000003

1亿VIP精品文档

相关文档