- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
发电厂课后题答案(Power plant questions after school)
发电厂课后题答案(Power plant questions after school)
2-1 which equipment belongs to primary equipment? Which equipment belongs to the two time equipment? What is its function?
A: usually, equipment such as generators, transformers and circuit breakers is called a primary device for the production, transformation, distribution, and use of electrical energy. The equipment which measures, monitors and protects the primary equipment and the operating state of the system is called the two equipment. Such as instrument transformer, meter, relay protection and automatic device, etc.. Its main functions are starting and stopping units, adjusting load and switching equipment and lines, and monitoring the running state of main equipment.
2-2 briefly describes the characteristics and main equipment functions of the electrical connection of 300MW generator sets.
Answer: 1) the connection of generator and transformer adopts generator transformer unit connection;
2) a high voltage transformer is used to supply the power at the low voltage side of the main transformer;
3) at the generator outlet side, three groups of voltage transformers and a group of arresters are connected through a high voltage fuse;
4) in the generator outlet and neutral side, each group is equipped with a current transformer 4;
5) the neutral point of the generator is connected with a neutral grounding transformer;
6) high voltage transformer, high voltage side, each group is equipped with current transformer 4.
The main equipment are as follows: the reactor: limiting the short-circuit current; current transformer, special transformer to transform current; voltage transformer: high voltage into low voltage, for all kinds of equipment and instrument, high voltage fuse: short circuit protection; neutral grounding transformer: used to limit the capacitive current.
2-4 what are the factors affecting the development of transmission voltage rating?
Answer: 1) long distance transportation of electric energy;
2) large capac
您可能关注的文档
- 南平美食(Nanping cuisine).doc
- 南宁三中vs南宁二中(Nanning third vs Nanning II).doc
- 南开11春学期《财务报表分析》在线作业(Nankai 11 spring semester financial statement analysis online homework).doc
- 南开11秋学期《大学语文》在线作业(Nankai 11 autumn semester College Chinese online homework).doc
- 南开12春学期《税收理论与实务》在线作业(Nankai 12 spring semester tax theory and practice online homework).doc
- 南宁的宠物店(Pet shop in Nanning).doc
- 南开11秋学期《管理学》在线作业(Nankai 11 autumn semester management online homework).doc
- 南开12春学期《管理学》在线作业(Nankai 12 spring term management online homework).doc
- 南开13秋学期《财务报表分析》在线作业(Nankai 13 autumn semester financial statement analysis online homework).doc
- 南开14秋学期《房地产概论与营销实务》在线作业(Nankai 14 autumn semester Introduction to real estate and marketing practice online homework).doc
- 发电机保养指南(Generator maintenance guide).doc
- 发电机励磁系统(Generator excitation system).doc
- 发电机失磁(Generator loss of excitation).doc
- 发电厂电气部分题目组-论文写作指导材料(Electrical section of power plant group - thesis writing guide material).doc
- 发电机房(Generator room).doc
- 发电机概述及工作原理(Generator overview and working principle).doc
- 发电机的保护(Generator protection).doc
- 发电机转子绝缘不合格的简单处理方法(Simple handling method of generator rotor insulation failure).doc
- 发行单位台北市南港区南港国民小学(Issuing unit Nangang District Taipei Nangang national primary school).doc
- 发达国家农业补贴政策给中国的启示(The Enlightenment of the agricultural subsidy policy of developed countries to China).doc
文档评论(0)