土木工程测量试卷3(含答案)(Civil engineering survey paper 3 (including answers)).docVIP

土木工程测量试卷3(含答案)(Civil engineering survey paper 3 (including answers)).doc

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土木工程测量试卷3(含答案)(Civil engineering survey paper 3 (including answers))

土木工程测量试卷3(含答案)(Civil engineering survey paper 3 (including answers)) Eleven Civil Engineering surveying Civil engineering surveying; civil engineering surveying Civil Engineering surveying curriculum Curriculum curriculum Three Thirty-three Three test paper Examination paper test paper Examination form Examination form Examination form close Closed close volume Curly volume Exam time The exam is in use The exam takes 2 hours Hour hour Hour, ,, This paper contains a total of This paper contains a total of papers This paper has a total of pages Page Page, ,, Please Please call another Please add Gaga Add scratch paper A draft of the papyrus manuscript Draft paper 1 Zhang A 1 question number Yiersansiwuliuqibajiushi score points scored I. individual choice questions (3 points per game, 15 points each) 1. The layout of the wires is as follows A, a wire, two wire, wire diagram B, unidirectional traverse, return traverse, polygonal lead; C, closed wire, sympathetic wire, branch conductor D, primary conductor, two stage conductor, three stage guide Line 2. in the following level, the elevation levels of A and B are m HA234.1=, mHB634.3=, the level from P to A, B distance of kmSAP3=, kmSBP2=, view The elevation difference is m HAP400.1=, mhBP010.1=, the leveling line is as seen. Is p The elevation is () A.2.630m, B.2.640, m, C.2.634m, D.2.628m 3, known A (4810.1013796.972), B (4957.2193588.478), then AB Coordinate increment =AB alpha (). A, 305 Degrees 12 28; B, 125, 12 , 28, C, 55, 47, 32 , D, 235, 47 32 4, the use of elevation of 6.531m level point A, measuring design elevation of 6.800m indoor + 0 elevation, level placed in a suitable position, read the level A, the level of reading 1.035m the aiming level is aiming at the + 0 level, and when the readings are, the height of the foot Is the + 0 elevation position? A, 1.766, B, 0.766, C, 0.866, D, 0.666 5, the method of adjusting the closing error of traverse coordinate increment is to take the closing difference back symb

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档