- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
综合布线系统作业答案(Integrated wiring system operation answer)
综合布线系统作业答案(Integrated wiring system operation answer)
Application private Notepad
[private Notepad] write notes
Integrated wiring system operation answer
[05-06 14:26]
1. what are the design points of the workspace configuration?
1. the laying of the inner groove of the work area should be reasonable and beautiful. 2. the information socket is designed above 30CM above the ground
3. the distance between the information outlet and the computer equipment is kept within the range of 5m. Pay attention to the work area cable, jumper and the length of the equipment connection line in total not more than 10m.
The 4. NIC interface type is consistent with the cable interface type.
5. estimate the required information modules, information outlets, and panel numbers for all work areas.
2. design points of wiring subsystem
1. determine the number and location of information outlet modules that are required for each building floor.
2. according to the engineering environment, determine the direction of the cable, determine the cable, the groove, the number and type of the pipeline, and the corresponding boom, bracket and so on. 3. determine the connection mode of the cable. 4. the type of cable used when voice points and data points need to be interchanged
Configuration design steps of 3. trunk subsystem
1. according to the star topology of the trunk subsystem, the trunk cable routing from the floor to the equipment is determined.
2. route map. Using standard graphics and symbols to draw the routing diagram of the trunk subsystem, the drawings should be clear and tidy.
3. determine the method of connecting cables between trunk lines.
4. determine trunk cable category and capacity. Cable trunk length scale available in the drawing of actual measurement, can also be calculated arithmetic sequence. Note that each length of trunk cable should be redundant (about 10%) and termination tolerance.
5. determine the support structure for the cabling of the main line.
4. configuration sub
您可能关注的文档
- 有药也不给你吃(There is no medicine for you).doc
- 有趣的windows(Funny windows).doc
- 有趣的心理减压法(An interesting psychological decompression).doc
- 有趣的心理测试(Interesting psychological tests).doc
- 有趣的线条(综合)(Funny lines (synthesis)).doc
- 有道词典单词(Youdao Dictionary word).doc
- 有限空间作业应急救援预案(Emergency rescue plan for limited space operation).doc
- 有进有退的人生 --倒立看世界(There is life in progress and retreat - looking at the world upside down).doc
- 有助于孩子长个头的五大食品(Five big foods that help a child grow up).doc
- 有限空间(Limited space).doc
- 综合护理干预对肿瘤介入术后患者疼痛的影响(Effect of comprehensive nursing intervention on pain after tumor interventional surgery).doc
- 综合机甲(Comprehensive mech).doc
- 纸张性能影响呈色效果(Paper properties affect color rendering).doc
- 综合评估二 化学基本理论(Comprehensive evaluation of two basic theories of Chemistry).doc
- 综采设备管理制度(Comprehensive mechanized mining equipment management system).doc
- 羽毛球地板(Badminton Floor).doc
- 翟鸿燊《大智慧之沟通技巧》(Zhai Hongshen, communication skills of great wisdom).doc
- 翼D群体(Wing D population).doc
- 职业 职位 名称 英语(English for professional position).doc
- 职业倾向系列问卷介绍(Career orientation questionnaire introduction).doc
文档评论(0)