装饰工程量计算规则(Rules for calculation of decorative quantities).docVIP

装饰工程量计算规则(Rules for calculation of decorative quantities).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
装饰工程量计算规则(Rules for calculation of decorative quantities)

装饰工程量计算规则(Rules for calculation of decorative quantities) Construction and decoration engineering quantity calculation and area summary - decoration engineering quantity calculation rule The first part, decoration engineering amount calculation summary First, according to the calculation of square meters: 1, floor works: The whole surface layer, surface layer and surface layer of rubber blocks (wood, carpet), skirting, stairs (steps) decoration (with a stair or step level projection area calculation), sporadic decoration project The 2 column, wall plastering, bulk, partition, curtain wall 3, ceiling plastering, ceiling (horizontal projection), light belt (according to the design drawings, size, frame, peripheral area) 4, door and window cover (unfold), glass, louver area 5, paint,: Wood, wood floor and surface wax, plaster surface, spray paint brush, paint, paper, air grille railings. Two, according to m calculation: 1, floor, floor: Handrails, decorative balustrade 2 doors and windows: Curtain box, curtain rail, window bedplate 3, paint, paint, paper: Wooden handrails and other boards, lines, paint, plaster lines, paint, lines, brush paint Three, according to quality calculation: 1 、 wall cylinder engineering: Dry hanging stone steel skeleton 2, paint: Metal surface paint Four, according to the number: 1, ceiling: Air supply and return air outlet 2 doors and windows: Wooden doors, metal doors, metal shutters, wooden windows, metal windows and other doors and windows 3 doors and windows paint The second part is the summary of the amount of construction engineering calculation Five, according to m calculation: 1 、 cast-in-place concrete: Cable trench, handrail, trench capping 2, factory warehouse, special doors, structural engineering: Other pieces of wood are calculated in volume or length 3 roofing and waterproofing works: Roof drain pipe, deformation joint 4 masonry works: Urinal, sleeper wall, brick ditch, ditch. Six square meters, according to the calculation: 1

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档