重庆鱼嘴长江大桥(Fish mouth, Chongqing, Yangtze River Bridge).docVIP

重庆鱼嘴长江大桥(Fish mouth, Chongqing, Yangtze River Bridge).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
重庆鱼嘴长江大桥(Fish mouth, Chongqing, Yangtze River Bridge)

重庆鱼嘴长江大桥(Fish mouth, Chongqing, Yangtze River Bridge) Fish mouth Yangtze River bridge is an inter provincial highway corridor for the development of the west, a large bridge project across the Yangtze River in the eastern section of Chongqing outer ring expressway. The bridge with Guangyang villa near the town of sunflower, the South Bank of the Yangtze River Stone Pandang across the Yangtze River, on the north shore of the Yangtze River beach landing, orchard stop fish mouth town. The bridge is a suspension bridge, with a total length of 1440 meters and a span of 616 meters. It is the key control project of the Chongqing outer ring expressway. The whole project has been completed and opened to traffic in April 2009, from Nanan District Guangyang to Jiangbei District fish mouth, drive by more than 1 hours to less than 5 minutes. Fish mouth Yangtze River bridge designed for two-way 6 lanes, 100 kilometers per hour. Beiqiao head has an overpass, crossing the Chongqing Huaihua railway. Jiangbei Yuzui Town Village buildings, 200 tons of steel box girder hoisting goes into the air. On the same day, the fish mouth Yangtze River bridge officially lifting the steel box girder Yangtze River bridge, an important joint project on the outer ring highway, was officially hoisted yesterday. The construction unit said, lifting construction is expected to last two months, the Yangtze River fish mouth to be in the 11 day period to 14 closed 3 hours. It is reported that the end of the mouth of the main bridge of Yangtze River Bridge River is expected to close through. The first span of the southwest begins lifting beams Fish mouth is my Yangtze River bridge outer ring expressway eastern section of control engineering, the bridge length of 1438 meters, two-way six lane, monolithic roadbed width of 33 metres, the design speed of 100 km / hour, the driving speed is the fastest, the main span of 616 meters (than Egongyan bridge 16 meters long) at present, the same type of bridge in Southw

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档