西门子间接寻址(SIEMENS indirect addressing).docVIP

西门子间接寻址(SIEMENS indirect addressing).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
西门子间接寻址(SIEMENS indirect addressing)

西门子间接寻址(SIEMENS indirect addressing) In this paper, the load characteristics of elevator are analyzed. The ideal speed curve of elevator with trapezoidal acceleration curve is expounded. The structure and working characteristics of elevator control system are discussed according to the performance of frequency converter and PLC. This paper expounds the method of generating the speed curve of the elevator, and sums up the characteristics of the software design of the control system composed of PLC. Keywords: load characteristic, ideal speed curve, control system, software design 1. overview With the continuous development of urban construction, high-rise buildings are increasing, the elevator in the national economy and life has a wide range of applications. Elevator, as a vertical transportation tool in high-rise buildings, is closely related to peoples daily life. In fact, the elevator is running according to the external call signal and self control law, and the call is random, the elevator is actually a man-machine interactive control system, simple to use in order to control or logic control can not meet the control requirements, therefore, the elevator control system uses a random control logic. Elevator control is currently generally used in two ways, one is the use of computer as a signal control unit, the completion of the lift signal acquisition, operation and function of the set to achieve lift and set the automatic scheduling function to run the election drag the control from inverter to complete; programmable controller with second control modes (PLC) implementation replace the computer control signal sets the election. From the point of view of control and performance, the two methods are not very different. Most of the domestic manufacturers to choose the second way, because the smaller scale of production their design and manufacture of high cost of computer control devices; and PLC high reliability, convenient and flexible programming features, stron

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档