消防设计文件申报要求(Fire fighting design documents declaration requirements).docVIP

消防设计文件申报要求(Fire fighting design documents declaration requirements).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
消防设计文件申报要求(Fire fighting design documents declaration requirements)

消防设计文件申报要求(Fire fighting design documents declaration requirements) Requirements for declaration of fire control design documents for construction projects Requirements for declaration of fire control design documents for construction projects The requirements shall be formulated in accordance with the provisions on the supervision and administration of fire control in construction projects, and shall be formulated in accordance with the depth regulations for the preparation of building engineering design documents. The fire protection design document provided by the construction unit in accordance with the law shall be in conformity with this requirement. I. General requirements (a) the fire design document should include design specifications, design drawings related major, major fire fighting equipment, fire protection products and fire performance requirements of building components and building materials, to reflect the focus of national construction in accordance with the technical standards on fire control design of the content of the mandatory requirements. (two) fire protection design documents shall be arranged in the following order: 1, cover: project name, design unit, date. 2, title page: design units, legal representatives, technical leaders, the project leader and the name of the professional responsible person, and signed by the above personnel or authorized seal. 3, design file directory. 4, design manual. 5, design drawings. Two. The contents of fire protection design documents for new and expansion projects (a) design specifications 1, engineering design basis. Including the approval of relevant government authorities, the main standard regulations designed and adopted (including the standard name, number, title and version number), the relevant departments of the engineering technical conditions of planning permission and approval, the use of construction units to provide the required information or production process. 2, construction scale and d

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档