现浇预应力砼箱梁满堂碗扣式支架计算书_pdf(The cast-in-place prestressed concrete box girder cuplock scaffolding calculation _pdf).docVIP
- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
现浇预应力砼箱梁满堂碗扣式支架计算书_pdf(The cast-in-place prestressed concrete box girder cuplock scaffolding calculation _pdf)
现浇预应力砼箱梁满堂碗扣式支架计算书_pdf(The cast-in-place prestressed concrete box girder cuplock scaffolding calculation _pdf)
The cast-in-place prestressed concrete box girder cuplock scaffolding calculation _pdf.txt what is the optimist? This...... Like a teapot, the bottom was burned red, and the mood whistled. Life is very simple, after today is tomorrow. It is not scientific to see a woman in ones life. This article is contributed by susuh15
Pdf documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
The cast-in-place prestressed concrete box girder cuplock scaffolding calculation
1 full use of cuplock scaffolding, along the transverse direction of the bridge pier in the distance of 0.9m, 3.6m on both sides of the range of 0.6m, the door frame spacing is 0.3m, scaffording middle layer transverse distance is 1.2m, the door frame pivot point is 0.6m, support the erection of 40B provincial road steel beam, beam spacing 0.9m. The 50 * 100mm longitudinal I-beam with the wood covered with 12mm bamboo, wood
Beams using bamboo and wood scaffold erection, the overall layout is shown in figure.A, whether to meet the requirements of bearing capacity of concrete according to the volume of the scaffolding beam Dikuan inspection: 11.2m, 90 meters long, the total area of the box girder bottom box girder concrete 1008m, volume 945.14m, plus the construction load by 1.2 times
Two
The bracket adopts multi-function bowl buckle type support, along the bridge longitudinal step distance 90cm, lateral step distance 90cm,
The pole capacity of 3.5t, to meet the requirements of.B, bamboo plywood produced by Jiangxi first, static
Building
Bending strength 55Mpa 2.7 * 9.8=26.46 Mpa, strength conforms to.C, upper and lower support allow load 50KN, wood []=11Mpa],
e = 1.1×10 5×10cm 横向方木 = bh / 12 = 5×10 / 12 = 416.7cm w = bh / 6 = 5×10 / 6 = 83.3cm q 总 = 2.7×9.8 = 26.46kn / m m = q 总 l / 8 = 26.46×0.3×0.9 / 8 = 0.8
您可能关注的文档
- 燃气灶具常见咨询问答(Gas cooker common consultation question and answer).doc
- 物流管理在医院物流中的作用(The role of logistics management in hospital logistics).doc
- 牛奶优势区域发展规划(Milk advantage regional development plan).doc
- 物流信息复习资料(Review information of logistics information).doc
- 物流管理就业方向(Logistics management, employment direction).doc
- 物流管理(Physical distribution management).doc
- 物流论文题目大全 - 物流百科(Logistics papers topic Daquan - Logistics Encyclopedia).doc
- 物流试题(Logistics examination questions).doc
- 物理上(Physically).doc
- 物流考试(Logistics examination).doc
最近下载
- 苏教版小学英语3a-5a单词表(2015).doc VIP
- 贵州钢绳(集团)有限责任公司招聘笔试真题2021.docx VIP
- 2025年职业卫生评价考试真题二十 .pdf VIP
- 2025年贵州钢绳集团有限责任公司控股人员招聘笔试备考试题及答案解析.docx VIP
- 全血和各种血液成分的临床应用.ppt VIP
- 软件系统安全保障方案.docx VIP
- 2025年云南省中考地理试卷(含解析).pdf
- 四川省拟任县处级试题 四川省拟任县处级党政领导干部任职资格考试题.doc VIP
- CECS 349-2013 一体化给水处理装置应用技术规程.docx
- 茶皂素杀螺活性及对3种水生生物的安全性.docx
文档评论(0)