监理工程师对工程变更的操作 文本文档(Supervision engineers operation document document for engineering change).doc
- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
监理工程师对工程变更的操作 文本文档(Supervision engineers operation document document for engineering change)
监理工程师对工程变更的操作 文本文档(Supervision engineers operation document document for engineering change)
Operation of engineering change by supervision engineer
In the implementation of highway construction projects, due to various reasons, there are many problems such as the change of the quantity of the works, the change of the project schedule, and the disputes between the contractor and the contractor in the implementation of the contract. These problems on the one hand is the result of survey and design work of rough, even in the construction process and found no consideration or inaccurate estimation of the quantities in the bidding documents, so it had to change the project or increase or decrease quantity; on the other hand, due to unforeseen accidents caused by shutdown or delay, then the engineering change. In China before the implementation of the supervision system of construction projects, engineering change is the construction units design units to rely on, since the implementation of construction supervision system, especially the international use of FIDIC conditions, the engineering changes in the specific operation and traditional engineering changes have great difference.
I. The occurrence of engineering changes
1. Scope of Engineering change:
Engineering change, any change about part of the contract in a broad sense, can be called a change, modify it includes not only the form in the project implementation changes, changes in the amount of engineering, engineering quality standards and level changes at the same time including the conditions of the contract. Engineering changes in the traditional sense are limited to design changes and construction drawings.
2. Nature of Engineering change:
Any part of the change, the owner, supervision and contractor can be raised, but the FIDIC requirements, no matter which side of the proposed change should be to engineer the final processing, and report to the employer for approval for the record, the engineer issued a ch
您可能关注的文档
- 白兰地的制作方法(Method for making brandy).doc
- 男士牛仔裤搭配(Jeans for men).doc
- 登陆界面和与access数据库连接(Login interface and connect to access database).doc
- 白化病 怎样预防和护理呢(How can albinism be prevented and taken care of).doc
- 病理学与病理生理学绪论习题及答案(Pathology and pathophysiology introduction, exercises and answers).doc
- 痛风、高尿酸血症与饮食治疗原则(Gout, hyperuricemia and diet treatment principle).doc
- 白手起家创业故事 四位亿万富豪创业史(Rags to riches entrepreneurship story four billionaires history).doc
- 白电百问百答(White baiwenbaida).doc
- 白糖期货--郑交所(Sugar futures - Zheng Jiao).doc
- 白癜风病理(Vitiligo pathology).doc
- 2024年江西省高考政治试卷真题(含答案逐题解析).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)物理试卷(含答案详解).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)地理试卷(含答案详解).pdf
- 2024年内蒙通辽市中考化学试卷(含答案逐题解析).docx
- 2024年四川省攀枝花市中考化学试卷真题(含答案详解).docx
- (一模)长春市2025届高三质量监测(一)化学试卷(含答案).pdf
- 2024年安徽省高考政治试卷(含答案逐题解析).pdf
- (一模)长春市2025届高三质量监测(一)生物试卷(含答案).pdf
- 2024年湖南省高考政治试卷真题(含答案逐题解析).docx
- 2024年安徽省高考政治试卷(含答案逐题解析).docx
文档评论(0)