- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工现场临时施工组织设计(Temporary construction organization design of construction site)
施工现场临时施工组织设计(Temporary construction organization design of construction site)
1. project overview
(1) this project is * * province (city) * project, located in * City, {East}, {Economic Development Zone}, * South Road, * northbound, * Street East, west of * street.
(2) the construction unit of this project is * * * company, the contractor is * company, the design unit is * city building design and Research Institute, the supervision unit is * company, the construction unit is * company.
(3) the floor area of this project * m2, the structural situation is {wholly cast-in-place reinforced concrete frame shear wall}, the total height of buildings * m, common floor. The first floor of this project is designed *, and has a {fire control center}, {reporter} room, two to * layer design office space, * * design *. The ground floor is designed as {room}, and the underground two layer is designed as {garage}, and the mezzanine is designed as {garage}.
2. general situation of power supply and distribution for construction
(1) site design (2) capacity of the platform is {500}kVA, and the ratio is 10 / 0.4kV, the transformer is located at the northeast side of the construction site, and the concrete location is shown in the general plan (not shown in this article).
(2) the low voltage power supply system of this project adopts TN-S grounding system. The low voltage power supply mode is {}}, which is directly drawn from the field transformer substation or the box type substation (first level control), then sent to each distribution box (two and control), and one or two and the distribution system diagram.
(3) a set of {5} fixed distribution boxes are set up on the spot. The specific configuration of the case is shown in Figure 2 (take the distribution box 5 as an example), and the location of the plane is shown in the general plan.
(4) according to the fire protection requirements, a switch is connected in parallel with the low voltage switch at the box type substation, and the f
您可能关注的文档
- 新市场形势下如何营销活动营销决胜未来医药市场(Marketing activities, marketing, deciding the future pharmaceutical market under the new market situation).doc
- 新建 3(Newly build 3).doc
- 新建 6(Newly build 6).doc
- 新学年购新机!2011年秋季学期diy组装机+配件推荐(New school year to buy new machine, 2011 fall semester DIY assembly machine + accessories recommended).doc
- 新妈妈坐月子饮食的宜与忌(New mother's diet should be appropriate and bogey).doc
- 新建 text file(New text file).doc
- 新建 红色的风采(New red style).doc
- 整蛊专家攻略(Energy-saving).doc
- 新建 text file type(新建 text file type).doc
- 新建文本 上百种超好吃的营养早餐!收藏着做吧。学会在家做给孩子吃!().doc
- 艾瑞咨询-2025年中国舒适眼镜白皮书.pptx
- 专题01 Units 4-6 重点语法归纳 七年级英语上学期期末考点(仁爱科普版2024).pptx
- 安全生产事故隐患大排查“百日攻坚”行动方案.PDF
- 第8课 欧洲的思想解放运动 课件高一下学期统编版(2019)必修中外历史纲要下(3).pptx
- 机械制图相关知识C语言及投影法等内容测试试卷.docx
- 第8课 欧洲的思想解放运动高一下学期统编版(2019)必修中外历史纲要下.pptx
- 第8课 现代社会的移民和多元文化 课件-高二历史统编版(2019)选择性必修三.pptx
- AIGC赋能高职“汽车新媒体营销”课程的应用探索.pdf
- 第8课 中国古代的法治与教化 课件-高三历史统编版(2019)选择性必修1一轮复习.pptx
- 21(null)大型购物中心 室内空气质量 解决方案.pdf
文档评论(0)