易高煤化磨煤操作规程(Operation rules for grinding coal with high coalification).doc

易高煤化磨煤操作规程(Operation rules for grinding coal with high coalification).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
易高煤化磨煤操作规程(Operation rules for grinding coal with high coalification)

易高煤化磨煤操作规程(Operation rules for grinding coal with high coalification) Operation rules for grinding coal with high coalification Gasification workshop To examine Validation Approval Catalog 1 post tasks:... 2 process description Page 3 3 process index Page 4 4 driving ... 4 pages 5. parking Page 6 6. mill interlocking system Page 8 7. abnormal phenomena and accident treatment Page 9 8. winter antifreeze treatment related matters Page 10 1 post task Coal, water, additives, NaOH, limestone as raw material in a mill made of high concentration, low viscosity, good stability and easy delivery of coal water slurry pump, to provide qualified raw material for gasification, to ensure the normal production of the device under the condition of engineering, equipment to ensure continuous and stable operation. 2 process description 2.1 process Brief From the raw coal to the coal processing section (particle size less than or equal to 25mm) the addition of coal storage, coal in the coal scuttle after weighing feeder W-0502 into the mill (H-0601). The limestone bucket V-0501 limestone is fed to the mill by screw conveyor, A-0509 and A-0510. The additive is sent to the mill through an additive tank (V-0604) through an additive dosing pump (P-0602). The water from the water tank V-0605 NaOH sodium hydroxide by NaOH pump (P-0604) to the coal mill (H-0601), coal water slurry and water together into grinding 60--65% concentration, through the outlet of the grinder drum screen to filter large particles after entering the mill discharge tank (V-0607) from the mill discharge tank into the pump (P-0605) coal slurry tank (V-0701) in. The water used for grinding the coal slurry is derived from the mill trough (V-0603) and fed into the mill by the pump (P-0601). 2.2 equipment list (see attached list) Main equipment: 1. rod mill system H-0601 1, 22. B 3. W-0502A coal weighing feeder, screw conveyor, A-0509 A-0508 limestone and A-0510 limestone, 4. M-0507A, B disc feeder 5. low pressure slurry p

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档