浅谈渠道测量的工作步骤(Talking about the working steps of channel measurement).docVIP

浅谈渠道测量的工作步骤(Talking about the working steps of channel measurement).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅谈渠道测量的工作步骤(Talking about the working steps of channel measurement)

浅谈渠道测量的工作步骤(Talking about the working steps of channel measurement) The channel is a water diversion project, which consists of a canal head, a canal, a aqueduct, an inverted siphon, a culvert, a control gate, a bridge and a series of supporting structures. The central location and characteristic elevation of these buildings should be measured according to a certain standard, so as to provide sufficient measurement data for channel design. Channel measurement, are on the ground along the selected center line and its two sides by longitudinal and cross section, and map, in order to draw map line design; then, engineering quantity, budgeting or budget, or as the basis for construction scheme comparison. The investigation and layout of canal engineering is closely related to the engineering design. Only in the field of laying line location and accurate measurement data on the basis of local conditions to make reasonable engineering design. According to the actual work experience, the following talk about the general measures and points for attention of channel measurement work. 1. job preparation meeting The preparatory meeting will be held prior to the start of the measurement. Party As Representative (who is responsible for the construction section of the first party), the surveyors and the designers shall attend the meeting. The purpose of the meeting is to clarify the tasks and specific requirements of this channel survey and to be relevant to the future design. First of all, it should be clear whether the new channel or reconstruction channel; if the converted channel has changed the line segment or cut curved straight channel section. Whether the channels have geological data or similar projects can be used for the geological data of this channel project. If there is no relevant geological data available, it is necessary to make clear the geological location of the central location along the channel and the proposed major building. At the meeting, Party A shall a

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档