浅谈渠道测量工作的一般步骤和注意事项(General measures and matters needing attention in channel measurement).docVIP

浅谈渠道测量工作的一般步骤和注意事项(General measures and matters needing attention in channel measurement).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅谈渠道测量工作的一般步骤和注意事项(General measures and matters needing attention in channel measurement)

浅谈渠道测量工作的一般步骤和注意事项(General measures and matters needing attention in channel measurement) Talking about the general steps and matters needing attention in channel measurement,.Txt if there is an afterlife, do a tree, stand Cheng Yongheng, no sad posture. Half in the soil, quiet, half in the wind flying, half fall cool, half bathed in sunshine, very silent, very proud, never rely on never looking for. The channel is a water diversion project, which consists of a canal head, a canal, a aqueduct, an inverted siphon, a culvert, a control gate, a bridge and a series of supporting structures. The central location and characteristic elevation of these buildings should be measured according to a certain standard, so as to provide sufficient measurement data for channel design. The purpose of channel survey is to measure longitudinal and transverse sections along the selected center line and its both sides on the ground, and draw a diagram so as to draw the design line on the map. Then calculate the amount of work, the preparation of budget or budget, as a basis for comparison or construction plan. The investigation and layout of canal engineering is closely related to the engineering design. Only on the basis of proper location and accurate measurement data can the project be economically and rationally designed. According to the actual work experience, the following talk about the general measures and points for attention of channel measurement work. 1 job preparation meeting The preparatory meeting will be held prior to the start of the measurement. Party As Representative (who is responsible for the construction section of the first party), the surveyors and the designers shall attend the meeting. The purpose of the meeting is to clarify the tasks of the channel measurement, the specific requirements and problems related to future design and the issues that need to be investigated. First of all, it should be clear whether the new channel or reconstruction channel; if the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档