测量放线施工方案(Measure the layout plan).docVIP

测量放线施工方案(Measure the layout plan).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
测量放线施工方案(Measure the layout plan)

测量放线施工方案(Measure the layout plan) Construction plan for measuring caving line.Txt This article is contributed by zhg1988125 WPS documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. A basis: 1, Jincheng International Trade Center building B 2 building construction drawings, variable line measurement procedures, 3 high-rise building construction Handbook, 4, 5 building construction manual construction and acceptance, two project overview the project for the city of Jincheng in the refield Estate Development Company Limited, and the Architectural Design Institute of Taiyuan city Jincheng International Trade Center building B, Shanxi province is located in Jincheng City, East Linze Road, South West of Hongxing street, planning road on the north side of Jincheng motor transport company limited. The engineering design for the frame shear wall structure, podium frame structure, two floors underground, the ground layer twenty-eight, annex four, two storey underground 3.6m, underground layers of high of 5.4m, one to three layers high are 5.0m, four storey podium floor height 4.2m, four storey, five storey main building the height is 3.6m, six layers of high of 5.0m, seven layers of high of 3.6m, eight layers of high of 3.3m, nine, ten layers high are 3.6m, ten to twenty-seven layers of high of 3.15m, twenty-eight layers of high of 4.75m. The total construction area is 39287m 2, and the total building height is 99.9m. The construction category of this project is one class, the fire resistance grade is grade one, the building service life is 50 years, and the seismic fortification intensity is 6 degrees, The waterproof level of roof is two, and the waterproof level of underground project is two. Three, construction survey, line preparation, construction surveying work is the construction of the pilot process, is to make the project Construction meets the requirements of engineering d

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档