装修人工费一般标准2(Decoration labor costs general standard 2).docVIP

装修人工费一般标准2(Decoration labor costs general standard 2).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
装修人工费一般标准2(Decoration labor costs general standard 2)

装修人工费一般标准2(Decoration labor costs general standard 2) Decoration manual fee reference standard (2012) Serial number, unit name, new reference price, original reference price, new reference price Demolition project 1 demolition Aluminum Alloy 8 frame 8 balcony closed work Aluminum Alloy window separately 2 wooden frame 8 frame 10 demolition 3 demolition of steel doors and windows (single, double fan) 14 Tang 10.006 layer above 20 yuan by the 4 demolition of steel doors and windows (single / double fan) protection fee zetoms 10 relates to the external structure 5 demolition of steel doors and windows (three or four pieces) 21 Tang 15.006 layer above 30 yuan by the 6 demolition of steel doors and windows (three or four pieces) protection fee zetoms 15 relates to the external structure 7 demolition of steel doors and windows (four pieces) more than 40 zetoms above the 30.006 floor by 50 yuan to calculate 8 demolition of steel doors and windows (four fan above) protection fee zetoms 20 relates to the external structure 9 20 14 square meters demolition of brick wall 10 remove tiles, wall tiles 15 square meters 10 11 remove flat roof, wall painting 4 2.50 square meters 12 remove flat wall wallpaper (wall), 3.50 M 4 13 demolition wood flooring (including wooden joists) 8 M 8 14 3 3 square meters of wooden floor demolition 15 demolition of fixed wood ceiling, wall panels, 7 square meters 5 16 removal of tin (Ming Guan) 2 2 square meters of water pipe 17 remove the desktop washbasin only 15, 20 no longer use 18 demolition of the washbasin, only 5, 5 no longer use 19 remove (water bucket wheel) only 5 5 no longer use 20 remove the toilet and even the water tank, only 8, 8 no longer use 21 35 25 cast iron bath tub only removed separately 22 remove wooden skirting 1.50 23 remove the window sill cover 10 Masonry work 24 1 18 12 square meters of brick masonry new without leveling plastering 25 new 1/2 12 8 square meters of brick masonry with leveling plastering 26 new 1/4 8.50 6 s

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档