矿山地质垂直应急救援的可行性研究(Feasibility study on vertical emergency rescue of mine geology).docVIP

矿山地质垂直应急救援的可行性研究(Feasibility study on vertical emergency rescue of mine geology).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
矿山地质垂直应急救援的可行性研究(Feasibility study on vertical emergency rescue of mine geology)

矿山地质垂直应急救援的可行性研究(Feasibility study on vertical emergency rescue of mine geology) Feasibility study on vertical emergency rescue of mine geology Brief introduction of mine geological vertical rescue technology: the technology of rapid vertical drilling on ground is a new technique for mine disaster relief in the last five years. Technological breakthroughs have been achieved abroad and successful experiences have been achieved. July 24, 2002 - 28, Pennsylvania - coal mine flooding accident occurred, 9 people stuck in the underground mining work surface, vertical depth more than 300 meters from the ground. At that time, the authorities used the rapid rig drilling from the ground to save people, 48 hours to complete drilling construction, with small drill to the disaster area personnel oxygen supply, to achieve communication links, with a big hole under the bucket, 9 people all rescued the ground. On 16 January 2003 Western Australia halls Creek a coal mine roof fall accident, and is accompanied by the formation water gushing accident, 2 miners were trapped underground, they use the fast drilling in 26 hours drilling 287 meters, accurate and penetrating with 2 trapped made contact, the final implementation of decentralization of the 2 hole bucket. People were successfully rescued. In recent years, many successful cases have also been achieved in China, which are embodied in 4 aspects: (1) grouting and blocking water. In April 12, 2003, the outburst flood well accident occurred in East Pang coal mine of Jinniu energy Limited by Share Ltd in Hebei province. China Coal earth Technology Development Company received notice, from Shanxi left right construction site, emergency mobilization T685WS car rig, rushed to the scene of the accident to participate in rescue operations. Grouting process of the layout of drilling 8, completed by 4 units, of which 4 drilling coal company T685WS earth drill, based on accurate penetrating on single hole drilled drill ahead of time than the

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档