电力机车启动步骤与启动电路(Starting procedure and starting circuit of electric locomotive).docVIP

电力机车启动步骤与启动电路(Starting procedure and starting circuit of electric locomotive).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电力机车启动步骤与启动电路(Starting procedure and starting circuit of electric locomotive)

电力机车启动步骤与启动电路(Starting procedure and starting circuit of electric locomotive) Starting procedure and starting circuit of electric locomotive A: first check the locomotive running Department Two, enter the drivers cab, open the power cabinet, close the tripping switch, check the high and low voltage appliances, to meet the requirements of the vehicle Three: closed electric key 1SA (2SA) 1, its pantograph 9YV bow valve, electric valve control circuit: 499-21QA-1SA (2SA) -454-1SK1 (2SK2) -420-410QS-579-9YV-400. Door protection valve control circuit: 454-8QS-7QS-7QP-217-YV-400 Main break delay relay coil 21KT control circuit: 454-13KA anti - 21KT-400 2, the main broken and closed 3SK1 (3SK2), its control circuit is: (the premise is speed control handwheel in the big 0, 10KA power, 21KT power, 21KA splitter not started, QF button instant not broken, 4KF is greater than or equal to 450KAP) 454-3SK1 (3SK2) -459-10KA-26QS- (460-13KA+21KT-461-21KA-463-QF anti chain -576-QFN relay -4KF) -400 After the button, 13KA and QFN relay at the same time to get the power QFN, the isolation switch closed, and its reverse connected by the QF and 13KA at the same time disconnect, because the 13KA relay, power 13KA, the disconnect is disconnected, so that 21KT loss of power, after a delay of 1 second, 21KT is the chain off. Four: split camera start, press the key switch, the control circuit is: 499-23QA-498-5SK1 (5SK2), -542-QF (26QS), -490 line has electricity 490-15QS (15QS) -504-21KA- (13KA relay +29KM+36KM) -400 490-15QS-533-5QP anti chain -521- (15KM+29KM) -544-15KM-400 Attached: 36KM relay is standby switch, not working when normal The 13KT and 29KM receive the power on 29KM at the same time, and the starting resistor is connected to the 15KM, so that the relay is connected and the power is connected 13KT delay 3 seconds after the start of 1AK began to let split camera detection power voltage reaches 55% - 60% split camera start relay 1AK is closed to 21KA chain and 21KA chain reacti

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档