第六部分 灾害预防(The sixth part, disaster prevention).docVIP

第六部分 灾害预防(The sixth part, disaster prevention).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第六部分 灾害预防(The sixth part, disaster prevention)

第六部分 灾害预防(The sixth part, disaster prevention) I. judgment questions 1. for coal seams or goaf with large gas emission, ventilation measures should be adopted when ventilation is not reasonable. (V) 2., in order to prevent the accumulation of gas, the local ventilator in addition to shift, other times are not allowed to stop the wind. (*) 3., the local ventilation system shall be listed, with special personnel management, and strictly prohibit the operation of local ventilators by non special personnel. (V) 4., under the premise of safety measures, special gas drainage lane can be carried out production operations and set up electrical equipment. (*) 5., a sharp drop in atmospheric pressure on the ground will cause abnormal gas emission. (V) 6. when the working face approaches the boundary of the mining area or the basic top, the gas on the working face will increase suddenly. (V) 7., high gas mine driving face, local fan must use three special, that is, special transformer, special switch, special care. (x) 8., underground blasting, strict implementation of gas inspectors, security inspectors and blasting workers three people linkage blasting system. (*) 9., blasting work must be carried out before charging, loading, and blasting must check the gas before the three checks system. (*) 10. safety measures must be taken when the underground electrification is checked and repaired and the electrical equipment is removed. (*) 11., the mine must take measures to prevent gas accumulation from the mining production management. (V) 12. underground work process, the use of the miners lamp burned out, should be changed into the airway. (*) 13., people must bring underground inflammable materials, to be approved by the person in charge of mining technology, and assign a special person responsible for their safety. (V) 14. when the underground is engaged in the electrical welding operation in the inlet and the return air lane, safety measures must be made every time. (*) 15. at

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档