实践日志资料(Practice log data).docVIP

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
实践日志资料(Practice log data)

实践日志资料(Practice log data) Tangyin County in the Chengguan substation monitoring system, we can see the basic components of 110KV main transformer power supply circuit: circuit breaker, partition switch, grounding switch, voltage transformer, current transformer, capacitor, arrester, bus, I specify my understanding of the electrical appliances Circuit breaker: under normal circumstances, control of various power lines and equipment of the beginning and closing, in the power system failure, the automatic removal of the power system short-circuit current, in order to ensure the normal operation of the power system. In this internship, the station used two circuit breakers, 10KV vacuum circuit breakers and 110KV six sulfur hexafluoride circuit breakers. Load switch: the load switch is an electric arc extinguishing device between the breaker and the partition switch. Normally, the opening and closing of switches for various power lines and equipment are controlled. But the short-circuit current can not be switched off. The load switch and the fuse can realize the function of the general breaker. Isolating switch: isolating switch is a kind of high voltage switch equipment. In structure, there is no special arc extinguishing device for isolating switch, so it can not be used to pull load current and short circuit current. The normal separate position, meet the safety requirements of the visible insulation distance between isolating switch ends in the network, the main purposes are: 1, equipment maintenance, isolation switch to isolate the electrical and dielectric parts, formed obvious open breakpoints, to ensure that the working personnel and equipment safety; matched, 2 the isolation switch and circuit breaker of gate operation, to change the mode of operation of system wiring. Its main function is electrical isolation. Earthing switch: when it is used for the maintenance of high voltage line electrical equipment, it is connected with the ground to ensure personal safet

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档