- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
涵洞施工工艺(Culvert construction technology)
涵洞施工工艺(Culvert construction technology)
First, the construction of pipe culvert
The use of embankment for the construction of pavement and site, half width construction, half width of traffic. The construction method of circular pipe culvert, fill out 1-2m excavator digging trench construction principle. At the site agreed by the owner, the manufacturer purchases the culvert.
Construction preparation:
(1) before the commencement of the culvert, submit the construction organization design and construction report to the engineer, and begin construction after the approval of the engineer.
(2) measuring and setting out: according to the plane position, elevation and geometry size designed by the drawing, the construction lofting is done.
Foundation pit excavation:
(1) the control stake of foundation pit is extended outside the foundation pit and 2m is fixed.
(2) the excavation of the foundation pit should maintain good drainage, and dig the well well outside the foundation pit to drain the foundation thoroughly.
(3) the excavation shall be excavated at the design elevation of +20cm, and then the remaining 20cm soil shall be excavated artificially so as to avoid mechanical disturbance to the basement soil.
(4) after foundation pit excavation, the bearing capacity of the foundation shall be checked. After it is qualified, it shall be properly repaired and laid in the shortest possible time. If the bearing capacity is not up to the requirements, the substrate shall be treated according to the instructions of the engineer.
Construction method of circular pipe culvert:
(1) purchasing the pipe culvert of the manufacturer designated by the supervisor or the owner.
(2) concrete base: after the foundation pit is excavated, the formwork should be installed first, and the concrete can be poured before the formwork is completed and accepted by the supervision engineer. The concrete adopts the field concentrated mixing, and the 30cm is spread on the ground, vibrated and smoothed.
(3
您可能关注的文档
- 正确认识保险(Correct understanding of insurance).doc
- 正确认识新营销时代的九种营销利器(Correct understanding of nine marketing tools in the new marketing era).doc
- 正确贯彻宽严相济 给力社会矛盾化解(Correctly implement the leniency awesome to resolve social contradictions).doc
- 正视竞争(Face up to competition).doc
- 步进电机运行系统控制设计(Stepper motor, operation system, control design).doc
- 此生只过奢华生活(This life only luxury life).doc
- 武器打造配方(Weapon recipe).doc
- 武士官名(Warrior name).doc
- 武威市2011年扶持高校毕业生就业工作公告(Wuwei in 2011 to support the employment of college graduates notice).doc
- 正确看待腐败现象(Look at corruption in the right way).doc
原创力文档


文档评论(0)