粉刷石膏抹灰工程(Plastering gypsum plastering project)
粉刷石膏抹灰工程(Plastering gypsum plastering project)
This chapter applies to the general civil and industrial building indoor concrete wall, aerated concrete wall to brush plaster engineering.
I. material requirements:
1 layer plastering gypsum: setting time is not less than 60min, not more than 8h. Fineness 0.2mm sieve margin is less than or equal to 40%. Flexural strength is greater than 3 MPa, compressive strength is greater than 5.0MPa.
2 bottom plastering gypsum: setting time is not less than 60min, not greater than 8h. Fineness 0.2mm sieve margin is less than or equal to 40%. Flexural strength is greater than 2.5 MPa, compressive strength is greater than 4.0MPa.
3 products must have the appearance certificate, product inspection report. Enter the factory need to product name, code name, net content, strength level, production license number, production address, factory number, implementation standards, date of production and so on the appearance inspection, good entry acceptance records.
Two 、 main machines and tools:
The main equipments include: portable electric mixer, mixing barrel (diameter 60-70cm, height 65-80cm), leveling tools, the level of scale, scraping bars, size and other float ash plastering tools etc..
Three, operating conditions:
1 plastering project must be completed in the concrete structure works, aerated concrete wall works, and after the acceptance of the relevant departments, construction.
2 plastering project construction temperature should not be less than 5 degrees Celsius, when must be under 5 degrees Celsius temperature construction, should guarantee the quality of the project effective measures.
3 indoor plastering, it is necessary to do a good job roofing waterproofing and indoor insulation work necessary closure.
4 before plastering, check whether the mounting position of the door and window frame on the plastering surface is correct and whether it is firmly connected with the wall. The connection gap at the application of 1:3 cement mo
您可能关注的文档
- 生物选择错项(Biological selection error).doc
- 生物预测育种类试题讲解-动易网络(Interpretation of biological breeding species test - Mobile Network).doc
- 生命就像环法赛(Life is like tour de France).doc
- 生理期瘦身(免费下载)(Physical fitness (free download)).doc
- 生管职责(Management responsibility).doc
- 生词 无拼音(New words without Pinyin).doc
- 生鲜农产品(fresh agricultural products).doc
- 用 人力资源反哺论化解三农的难题(Solving the problems of three rural issues with human resources feedback theory).doc
- 用c#和本地win api操纵系统菜单(Use c# and local win API to manipulate the system menu).doc
- 用c语言编写windows服务器(Using C language to write Windows Server).doc
原创力文档

文档评论(0)