- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程项目管理综合练习(Comprehensive practice of construction project management)
建筑工程项目管理综合练习(Comprehensive practice of construction project management)
First, individual choice questions
1. supplier of the project management work in the main (stage).
A. design, B. design, preparation, C. construction, D. preparation before use
2., the three major objectives of project management are ().
A. scope, cost, schedule, B. cost, schedule, quality
C. investment, schedule, quality, D. range, investment, quality
3. the project management of the construction side involves () the whole process.
A. design before the preparation stage to the warranty period, B. design stage to the pre launch stage
C. design stage before preparation to pre production stage, D. design stage to warranty period
4. each work department may have several conflicting sources of instruction, the organizational structure is () the organizational structure.
A. function B. linear C. matrix D. Division
5., the project construction can be divided into stages according to the stages.
A. construction contract, design contract and construction contract
B. unit construction contract and general contract of project
C. unit price contract, lump sum contract, cost plus fee contract
D. project commissioned supervision contract, engineering design contract, engineering materials procurement contract
6. the correct order for the tender documents is ().
A. binding site survey and the results of the tender will be prepared, further analysis of the construction organization design, and preparation of bidding documents
Check the bill of quantities, determine the quotation, form the tender document and guarantee the bid
B. binding site survey and the results of the tender will be prepared, further analysis of the bidding documents, check the bill of quantities to make
Organize the construction design to determine the quotation to form the tender document to guarantee the bid
C. binding site survey and the results of the tender will be prepared, further analysis of the bidding documents, check the bill of
您可能关注的文档
- 就这样开创蓝海,乐活滋果汁策划记实(In this way, create a blue ocean, LOHAS fruit juice planning record).doc
- 尴尬的红酒营销(Embarrassing red wine marketing).doc
- 就李昌奎案与车浩博士再商榷(Discuss Dr. Li Changkui's case with Dr. Hao Hao).doc
- 就业指导考试部分问题答案(Part of the questions about the employment guidance test).doc
- 尼龙(nylon).doc
- 局域网ping不通原因(Lan Ping blocked reason).doc
- 局域网ping不通的原因(The reason why Lan Ping is blocked).doc
- 尚丰五步棋打造金牌营销团队(Shang Feng five moves to create the gold marketing team).doc
- 局域网不能访问共享问题(LAN does not access shared problems).doc
- 尼龙简介及特性(Introduction and characteristics of nylon).doc
最近下载
- 《延安,我把你追寻》相关知识.pdf VIP
- 部编版语文五年级上册单元检测试卷合集(全册9 套).docx VIP
- 测绘单位技术质量管理制度.pdf VIP
- 我的伯父鲁迅先生完美版.ppt VIP
- 表D.0.12(导地线接续管)鸿昇+盛步.doc VIP
- 施耐德Schneider Modicon M251 Distributed PAC, 用户指南.pdf VIP
- as nzs2088-13卧式推车和坐卧两用安全要求.pdf VIP
- 产品设计材料与工艺:木材及加工工艺PPT教学课件.pptx VIP
- 2025年事业单位招聘考试综合类专业能力测试试卷(计算机类)——计算机应用技术试题.docx VIP
- 2024年部编版语文五年级上册全册单元检测题及答案(共8套).pdf VIP
原创力文档


文档评论(0)