- 1、本文档共30页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业设计 (论文)
外文翻译
设计(论文)题目: 宁波天合家园某住宅楼
2号轴框架结构设计与建筑制图
学 院 名 称: 建筑工程学院
专 业: 土木工程
姓 名: 陈绍樑 学 号 09404010421
指 导 教 师: 马永政、陶海燕
2012 年 12 月 10 日
外文原稿1
Tension Stiffening
in Lightly Reinforced Concrete Slabs
1R. Ian Gilbert1
Abstract: The tensile capacity of concrete is usually neglected when calculating the strength of a reinforced concrete beam or slab, even though concrete continues to carry tensile stress between the cracks due to the transfer of forces from the tensile reinforcement to the concrete through bond. This contribution of the tensile concrete is known as tension stiffening and it affects the member’s stiffness after cracking and hence the deflection of the member and the width of the cracks under service loads. For lightly reinforced members, such as floor slabs, the flexural stiffness of a fully cracked section is many times smaller than that of an uncracked section, and tension stiffening contributes greatly to the postcracking stiffness. In this paper, the approaches to account for tension stiffening in the ACI, European, and British codes are evaluated critically and predictions are compared with experimental observations. Finally, recommendations are included for modeling tension stiffening in the design of reinforced concrete floor slabs for deflection control.
CE Database subject headings: Cracking; Creep; Deflection; Concrete, reinforced; Serviceability; Shrinkage; Concrete slabs.
1Professor of Civil Engineering, School of Civil and EnvironmentalEngineering, Univ. of New South Wales, UNSW Sydney, 2052, Australia.Note. Associate Editor: Rob Y. H. Chai. Discussion open untilNovember 1, 2007. Separate discussions must be submitted for individualpapers. To extend the closing date by one month, a written request must
be filed with the ASCE Managing Editor. The manuscript for this technicalnote was subm
文档评论(0)