FIDIC红皮书中承包商遭受延误和(或)招致费用增加的处理

Contractor Suffers Delay and/or Incurs CostClauseconditionTimeCostProfit1.9Delayed Drawings and InstructionsIf the Contractor suffers delay and/or incurs Cost as a result of a failure of the Engineer to issue the notified drawing and instruction within a time which is reasonable and specified in the notice with supporting details…√√√2.1Right of Access to the SiteThe Engineer shall give the Contractor right of access to, and possession of, all part of the Site within the time (or times) stated in the Appendix to Tender.If the Contractor suffers delay and/or incurs Cost as a result of a failure