RPLC项目检查和测试程序.doc

  1. 1、本文档共34页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
RPLC项目检查和测试程序

Inspection and Test Procedure for Construction of RPLC Project RPLC项目检查和测试程序 DOC. No.: F074-PI-0310-0001 Revision Status: C 18-07-13 Issue for Approval B 28-05-13 Issue for Approval A 17-04-13 Issue for Approval Rev. Date Description Prepared By Checked By Approved By HYUNDAI-WISON Client Qin Yong Shi Xiangquan Zhang Shouyue Table of Contents 1 INTRODUCTION简介 3 1.1 Purpose 3 1.2 Scope 3 1.3 Definitions and Abbreviations 3 2 PROCESS 5 3 GENERAL NOTICE 5 4 OVERVIEW 7 5 STEEL STRUCTURE 9 6 PAINTING, BLASTING, GALVENIZING 14 7 PIPING 17 8 EQUIPMENT 27 9 ELECTRICAL 29 10 INSTRUMENT 29 11 WEIGHTING 30 12 LOAD OUT 30 13 DELIVERY 31 INTRODUCTION简介 This document presents the Wison (Nantong) Heavy Industry (BUILDER) Project Fabrication Inspection and Test Plan (ITP) for the module of RPLC Deep Conversion Project. 本程序介绍的是惠生重工RPLC项目的关于生产检查和试验计划。 The ITP is prepared and managed by the Project Quality Assurance Manager in accordance with the Project Specifications.本程序是项目质量保证经理根据项目的特殊说明而啊指定的。 Purpose目的 To describe the inspection and test items during the project construction period and define the “Hold point”or “Witness point”or “Review Point”or “Surveillance Point” to ensure that the quality of each product item can meet the requirement of contract, specifications and drawings. This Inspection Test Plan (ITP) shall be issued for HIWIN (CONTRACTOR) and/or PDVSA (COMPANY) approval as required.本程序是在项目施工期间,为了描述检查和测试项目以及定义“节点控制”或者“见证点”、“检查点”、“监测点”来确保产品质量满足合同需要,满足图纸的说明。此ITP程序文件必须经过HWIN和PDVSA的批准。 Scope前景展望 This ITP covers all BUILDER Fabrication yard inspection and test items for the piperack module of RPLC Deep Conversion Project. The ITP must ensure compliance with the requirements of Production drawings, specifications, contract and relevant standards. 此ITP包含RPLC项目部管廊模块所有预制厂房的检查和测试项目。此ITP必须确保遵守生产图纸,说明以及合同相关标准的需要。 Definitions and Abbreviations 定义和缩写代码 Definitions定义 The following definitions apply to this Project I

文档评论(0)

hhuiws1482 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档