- 1、本文档共73页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2010 2014年自考03201护理学导论试题答案历年试题及答案汇总
parts is permitted only after installation. 9.5.7 and buried parts of electrical equipment installation (1) electrical installation of embedded parts: includes all cable in the cable trench support and installation of embedded parts; Chamber hoist cable junction box installed and embedded parts of hydraulic closed-buried machine room and sluice hoist indoor lighting tubes and lighting installation of embedded parts. Necessary spare parts production. (2) installation of lighting facilities: includes Crest and gate Chamber of hydraulic closed-platform lighting line laying, installation of lighting equipment. (3) installation requirements 1) all materials used shall comply with the provisions of the construction drawings. Material must have a manufacturers quality certificate, which shall not be less than the provisions of the existing national standards. 2) require the use of substitute materials, certificate of quality alternative materials and trial results shall be submitted to the supervisor for approval. The alternative materials may not be used without the approval of the supervisor. 3) modification construction drawings, should submit written amendments submitted to the supervisor for approval. 4) certificate
parts is permitted only after installation. 9.5.7 and buried parts of electrical equipment installation (1) electrical installation of embedded parts: includes all cable in the cable trench support and installation of embedded parts; Chamber hoist cable junction box installed and embedded parts of hydraulic closed-buried machine room and sluice hoist indoor lighting tubes and lighting installation of embedded parts. Necessary spare parts production. (2) installation of lighting facilities: includes Crest and gate Chamber of hydraulic closed-platform lighting line laying, installation of lighting equipment. (3) installation requirements 1) all materials used shall comply with the provisions of the construction drawings. Material must have a manufacturers q
您可能关注的文档
- 全省农村信用社案防和安保工作要点.doc
- 全省推进中小学校舍安全工程现场会议经验交流材料 全省推进中小学.doc
- 全称和缩写,再次出现时可以使用缩写 三 除课程负责人外,根.doc
- 免疫学总论 325页 全套.ppt
- 八年级下数学分式专题习题:《分式计算及分式方程练习题》.doc
- 八年级生物上册 第五单元第一章各种环境下的生物复习提纲 人教新课标版.doc
- 公共营养师考试培训课件营养学基础矿物质.doc
- 公务出差人身意外伤害保险附加住院津贴保险条款 华泰财产保险股份有限公司.doc
- 公共营养师考试培训课件营养学基础维生素.doc
- 公务出差人身意外伤害保险附加员工替代保险条款 华泰财产保险股份有限公司.doc
文档评论(0)