隧道下穿既有结构物引起的地表沉降控制标准研究.pdfVIP

  • 6
  • 0
  • 约1.77万字
  • 约 6页
  • 2018-01-02 发布于浙江
  • 举报

隧道下穿既有结构物引起的地表沉降控制标准研究.pdf

隧道下穿既有结构物引起的地表沉降控制标准研究

Journal of Eng ineering Geology 工程地质学报 1004 - 9665 /2011/ 19 ( 1) 010306 * 陈星欣 白 冰 ( 100044) , , , , , , : U 456. 3 : A CONTROL STANDARDS FOR SETTLEMENT OF GROUND SURFACE W ITH EXISTING STRUCTURES DUE TO UNDERGROUND CONSTRUC TION OF CROSSING TUNNELS CH EN X ingx in BA I B ing (S chool of C iv il E ng ineering, B e ij ing J iaotong Un iv er sity, B e ij ing 100044) Abstract G round settlem ents due to construct ion o underg round tunne ls crossing ex isting structures are an mi por tant issue. It is o ten encountered in the deve lopm ent o underg round tra ic and high speed ra ilw ays lines. T his pa per invest igates the g round settlem ent standards and m ethods cau sed by tunne l excavat ion. A ccording to the d i er ent characteristics o roads, ra ilw ays, tunnels and bu ildings, and including di erent construction characterist ics, ex cavation areas, depths and eng ineering geo log ica l conditions, di erent ex isting structures have d i erent contro lm eas ures and recomm ended standards. So, the curren t standards o ground sett lem ents are unreasonable in tunne ls cross ing, becau se the characteristics o the ex ist ing structure, geolog ical cond itions and construct ion ea tures m ay no t be taken into account in the ground settlem ent standards. K ey words T unnel, Ground settlem ent, Crossing, Settlem ent standard, Contro l m easure 1 , , , , * : 2010 - 06- 0 1; : 20 10 - 10- 18. : , . Em ail: caoshang ei332@ 163. com 104 J ournal of E ng ineering Geology 工程地质学报 2011 ,

文档评论(0)

1亿VIP精品文档

相关文档