- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Content
1. Introduction
1.1 Scope of Application
1.2 Product Type Specification
1.3 Transformer Structure
2. Transporting and Hoisting
2.1 Requirement for Transporting
2.2 Subject Transporting
2.3 Subject Hoisting
2.4 Subject Pulling and Lifting
3. Acceptance and Storage
3.1 Inspection of Merchandise Received
3.2 OOBA Acceptance for Accessories
3.3 Acceptance Storage
3.4 Insulating Oil Management
4. Installation and Inspection of Transformer
4.1 Preparation for Transformer Inspection
4.2 Conditions and Precautions for Transformer Inspection
4.3 Scope of Transformer Inspection
4.4 Test of Transformer Inspection
5. Integral Compounded Installation and Vacuum Oil Filling
5.1 Preparation for Installation
5.2 Installation Program Flow
5.3 Vacuum and Vacuum Oil Filling
5.4 Replenishment and Standing
5.5 Vacuum Oil Filling of Transformer without Inspection
5.6 Installation of Other Components
6. Pre-test Inspection and Acceptance Trial
6.1 Pre-test Inspection
6.2 Acceptance Trial
7. Inspection Before Launch and Unload-energization
7.1 Inspection Before Operation
7.2 Unload Test
7.3 Unload-energization
8. Operation and Maintenance
8.1 Operation
8.2 Maintenance
8.3 Transformer Failure Analysis and Clearance
Ⅰ. Introduction
1.1 Scope of Application
1.1.1 This specification is a document of technological guidance in installation and application, only applicable for oil-immersed transformer of 110kV (including off-circuit tap changing transformer, on load tap changing transformer, auto coupling transformer, and commutator transformer).
1.1.2 Scope of Application: Requirements of transformer transporting by railway, road and ship; precautions for field acceptance and storage; field operation flow and acceptance trial; conditions for launch and daily maintenance; failure identification, etc.
1.1.3 Application of this specification should be integrated with specific structure of transformer for proper construction according to relevant terms of technological requirements
您可能关注的文档
- XX市政道路沥青混凝土面层施工专项设计方案.doc
- XX年辽宁省建设工程费用参考标准.doc
- 北京某公路养护有限公司院内水塔拆除技术详细方案.doc
- 标段号:32号,项目电压等级110千伏,变电容量4.00万千伏安-xx输变电工程监理大纲.doc
- 赤水市长沙镇“组组通”水泥砼路面工程(长沙镇6个村全长约52KM)专项施工设计方案.doc
- 大望京村2号地项目给排水、消防安装工程(地下部分)监理方案与实施细则.doc
- 道路与桥梁工程生产实习报告与内容.doc
- 都江堰市XX栏杆扶手制作安装工程详细施工方案.doc
- 房屋建筑学综合试题大全含答案.docx
- 房屋建筑工程与市政基础设施工程质量评估分析报告.doc
- 承插式球墨铸铁给水管安装与调试详细施工方案.doc
- 大唐云南永善大坪子风电厂110kV送出线路工程安全事故应急措施与预案.doc
- 二连浩特市海关大道道路工程路基路面详细施工方案.doc
- 福鑫-南郡工程(建筑面积:约14万平米)消防招标文件最终版.doc
- 大石窝镇下庄村永久避险安置房建设项目——防水专业施工招标文件.doc
- 工期目标:保证60日历天完工某路灯详细施工设计方案.doc
- 公路工程施工安全技术细则与规范JTGF90-2015.docx
- 华电莱州风能发电有限公司郭家店风电场一期重大危险源分析.doc
- 黄石市装饰装修工程竣工验收备案文件汇总.doc
- 济南某电气工程有限公司-某工程专项施工设计方案(含施工工艺等详细内容).doc
文档评论(0)