青岛市南软件园G-1、G-2工程
脚手架工程施工方案
编制:
审核:
批准:
青岛建设集团华友建设发展有限公司
二○○四年七月
目 次
1. 工程概况····································································2
2. 方案选择····································································2
3. 施工工艺····································································2
3.1 脚手架搭设工艺
3.2 脚手架拆除工艺
4. 施工方法····································································3
4.1 脚手架基础
4.2 悬挑槽钢的支设
4.3 脚手架搭设
4.4 脚手架拆除
5. 主要资源需求计划·························································5
6. 施工要求及安全技术措施·················································5
6.1 施工要求
6.2 安全技术措