武隆经济期.doc

武隆经济期

第18期 武隆县发展和改革委员会 2011年11月30日 要 目 合作共赢,打造以旅游为先导的渝东南特色经济区………………………(2) 加强我县政府投资项目投资管理的思考………………………………… (3) 渝东南产业发展重点和武陵山区域经济板块定位的思考……………… (5) 武隆县农户万元增收工程实施情况分析…………………………………(6) 我县近年来重大改革创新举措及其成效…………………………………(8) 武隆县11月价格运行状况分析1-10月社会事业固定资产投资情况分析 促进社会稳定11月份全县蔬菜价格运行状况及走势预测 切实缩小区域差距 manufacturers of technical documents on the quality requirements applicable to this project. Construction quality inspection and evaluation standards issued by the national power company of the electric power construction standard for quality inspection and assessment of the 11 articles assessment inspection standards as well as other relevant regulations issued by the Ministry of electric power, the State power company executive. Does not verify in the specification within the evaluation criteria, implementation design, manufacturer or ... Or issue a new national standards and regulations, bidders shall comply with new norms and standards. If there are conflicts or is inconsistent, whichever is the higher standards. 3.3 3.3.1 project of responsibility, authority and communication organization and project managers, at all levels of responsibility and authority see section II of chapter III of the present tender site management organization and part of workforce planning. 3.3.2 according ISO 9001, GB/T 50430 and company quality distribution of the quality manual, combining the departments of projects, project quality function distribution allocation table on the following page of the projects quality functions shown below. 3.3.3 project with each Department interface, interface between the internal departments of the project by project managers at all levels and the quality regulations of the responsibilities and authorities of the Department. Customer requirements and hope: project management; Quality planning, management program: the projects quality control Department; Site design: Project Engineering Department; Contract: the contract budget manufacturers of technical do

文档评论(0)

1亿VIP精品文档

相关文档