网站大量收购独家精品文档,联系QQ:2885784924

[建筑]建管系新楼采购计划_49704218.doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
[建筑]建管系新楼采购计划_49704218

Assignment 1 to the students who attend the Contract Documents for Construction 27 March 2012 Selection of method for procurement of works for New Office Building of the Department of Construction Management, Tsinghua University, Beijing Description of the assignment The department has found the existing office building unsuitable for its current daily operation and the near future development and it has initiated a renovation project to alter the single storey building to a three storey one. The proposed new building will be sited in the place and of 8,000 m2 to accommodate the 20 faculty members, 50 postgraduate students for master and/or doctor degree, 20 visiting scholars, 20 post-doctor researchers and 6 administrative employees. The new building will consist of offices, an exhibition hall, two computer laboratories, a library, three meeting room, a lecture theatre, a tea room and, of course, the toilets. The department has to finance the new building on its own. A preliminary estimate indicates that the proposed facility will cost the department RMB 10 million yuan. The fund now available to the department is RMB 10 million yuan and it has to raise the remaining RMB 5 million yuan to pay for the proposed new facility. It is preferable that the design documents be prepared by Tsinghua University Building Design and Research Institute subsidiary to Tsinghua University. However, the contractor must be selected on a competitive basis, according to the Tendering Law of the Peoples Republic of China. Obviously, the existing building must be demolished before the construction can proceed and its current occupants must be relocated somewhere else for the uninterruptible operations. Please select a method of procurement of works which is best suitable in your opinion for the project. Your choice shall be justified having regard to the circumstances. You are also required to complete the invitations to request for proposals for the design of the works and to tender f

文档评论(0)

qiwqpu54 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档