网站大量收购独家精品文档,联系QQ:2885784924

工程造价毕业论文文献外文中英文中英文翻译英文测量返工对工程造价的性能的影响.doc

工程造价毕业论文文献外文中英文中英文翻译英文测量返工对工程造价的性能的影响.doc

  1. 1、本文档共34页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Measuring the Impact of Rework on Construction Cost Performance 测量返工对工程造价的性能的影响 系别:建筑工程管理系 专业:工程造价 Measuring the Impact of Rework on Construction Cost Performance Bon-Gang Hwang1, Stephen R. Thomas, M.ASCE2, Carl T. Haas, M.ASCE3, and Carlos H. Caldas, M.ASCE4 1 Assistant Professor, Dept. of Building, National Univ. of Singapore, Singapore 117566. E-mail: bdghbg@.sg 2 Associate Director, Construction Industry Institute, Austin, TX 78759-5316. E-mail: sthomas@ 3 Professor, Dept. of Civil Engineering, Univ. of Waterloo, Waterloo ON, Canada N2L 3G1. E-mail: chaas@civmail.uwaterloo.ca 4 Assistant Professor, Dept. of Civil, Architectural, and Environmental Engineering, Univ. of Texas at Austin, Austin, TX 78712-0276. E-mail: caldas@ (Accepted 23 September 2008) Introduction Construction projects often experience cost and schedule overruns and rework is a significant factor that directly contributes to these overruns. Research by the Construction Industry Institute (CII) reveals that direct costs caused by rework average 5% of total construction costs (CII 200511). Considering that the U.S. construction industry expended $1,502 billion in 2004 for total installed costs (Bureau of Economic Analysis 20065), almost $75 billion was wasted on direct costs caused by rework in that year alone. Therefore, rework must be considered a significant factor affecting cost performance in the construction industry. Several research efforts (O’Conner and Tucker 198623; CII 19897; Davis et al. 198912; Burati et al. 19924; Love et al. 1999a20, b21; Love 2002b16; Fayek et al. 200313; Love and Edwards 200417) have attempted to identify and classify the root causes of rework, and to quantify its overall extent. Employing the metric, total field rework factor, and the classification of rework sources developed by CII, this paper assesses the direct impacts of rework on construction cost performance using data from 359 actual projects. More

文档评论(0)

xingyuxiaxiang + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档