- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Panduit布线系统
* Provides for a multiport outlet with extended equipment cords. * This table defines the lengths of patch cords as the horizontal cabling lengths are decreased. The max equip cord length is 22 meters or 72 ft. as long as the horizontal cabling is 70 meters or less. * A consolidation point is similar to a MUTO in that it provides a termination point for up to 12 work areas.But the physical characteristics are completely different. A CP must be an interconnection, there are no patch cords or jumpers. A CP feeds outlets in the work area where a MUTO is the outlet for the work area. The most common devices for a CP are punchdown blocks and patch panels. When using a patch pnl, solid cable is hard wired on the back of the patch pnl and solid cable is plugged into the front to go out to the work area outlet to be hard wired to the jack. Stranded cable is not allowed. * Here is an example of a CP feeding work area outlets. * * * The Basic Link is the horizontal cable from the closet to the workstation outlet plus 2 meters at each end for test leads. The max distance for the Basic Link is 94 meters. * * * The channel includes the Permanent Link (C) plus the patch cords, cross connect, and equipment cords each end. * These are the six test parameters defined in 568 – B.2. New to B.2 are PSNEXT, ELFEXT and PSELFEXT. Wire map is a continuity test for each pair. Length assures that the Permanent Link is 90 meters or less, and/or the channel is 100 meters or less. These were defined and required under TSB 67 in 568 A. They are NOT listed in the 568 B document. However they are still tested in the testing procedure. None of the listed tests can be performed without continuity and Level 2 testers will not pass anything that exceeds the distance requirements. Attenuation is a measure of signal loss. NEXT is a measurement of signals coupled from one pair to another within the cable measured at the transmitted end * There are margins for Pass Fail. There have been discussions to
您可能关注的文档
- Maxplus Ⅱ基本操作方法.doc
- MBA_从嘉永红木家具厂分析传统红木行业企业发展问题.doc
- M701F型燃气蒸汽联合循环机组的启动.ppt
- MCS51单片机最小系统设计(冲突时的文件备份2016-06-07 15-13-22).ppt
- maya毛发介绍.doc
- 世界文化的多样性3概要.ppt
- 世界无烟日主题班会概要.ppt
- matlab软件设计实验报告(各源程序均运行无误).doc
- 世界时普遍联系的概要.ppt
- METAL – ENCLOSED BUS.pptx
- 工程施工现场安全保证体系.docx
- (教学设计)《日月山川》.docx
- 跨境电商供应链管理培训教案.pptx
- 2025北大师版三级数学上册第三单元《大数加与减(二)》大单元教学设计(2022新课标).docx
- 2025年河北中考数学试卷分析及建议解析.docx
- 2025年班主任家访工作反思.docx
- 2025年人教语文六年级下册第二单元第五课鲁滨逊漂流记(节选)费曼学习法操作过程.docx
- 教学研究:课程思政导向下技工院校汽车维修专业一体化教材建设研究.docx
- 2025年九年级英语全册《Unit2Ithinkthatmooncakesaredelicious!》大单元整体教学设计.docx
- 2025青岛版七级数学上册第五章《一元一次方程》大单元教学设计(2022新课标).docx
最近下载
- 船用UG-25+调速器安装调试手册.pdf
- 城市残疾人居家托养服务项目效果评估:多维度分析与优化策略.docx
- 石家庄市网约车认证理论统考题库(含答案).docx VIP
- 高速公路隧道消防系统养护制度与管理方案 .pdf VIP
- 高频精选:曲师大考研西方音乐史真题及答案.doc VIP
- 智能穿戴设备在武术运动中的运动数据分析报告.docx
- Leadshine雷赛CL3C-EC808AC经济型EtherCAT总线闭环步进驱动器用户手册.pdf
- 220kv架空线路设计.doc VIP
- CSC5113_V13926596180三节锂电池保护芯片.pdf VIP
- 自主导航无人设备的施工安全智能预警系统开发.docx VIP
原创力文档


文档评论(0)