- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
澳洲移民—土木工程CDR
CAREER EPISODES 1
CE1.1 Introduction
This career episode is to briefly describe my work duties and work place activities during the project of “***************”, from August 2002 to May 2003, when I was working as an assist structural engineer in Structure DR Institute of *********************, this project is located in Beijing, China. This design project was started from August 2002 and was finished in May 2003, and the construction phrase was from August 2003 to May 2005, and now the building is in the operation.
CE1.2 Background
CE1.2.1 Nature of the project
The project of *****************” is a building complex which site occupied 31,100m2, the total building area is 280,000m2, and the highest towers are all have 23 stories and the cornice height is 99.15m. The function of it is cover from office building, commercial building and hotel, to large-scale public bus-subway transfer station. The structure forms include frame-shearwall system and frame system, with multi-story basement. This building group includes four towers (No.1 to No.4) and an annex, and there is a six stories annex which jointed three towers (No2~No.4) into a whole.
CE1.2.2 Objective
My company’s work was to complete the whole design from area plan, landscape design, architecture design, structure design, mechanical, electrical, heat ventilating and air conditioning design, and plumbing design according to the site conditions and environment, as well as within the limited budget and schedule, After the design phase, we should instruct and oversee the construction, solve the unclear questions on the blueprints and even offer altered design to meet the required changes. As the construction completed, my colleagues and I also have the responsibility to conduct the check and accept.
CE1.2.3 My duties
As a structural engineer, I was one of main designers in our workgroup. I was in charge of the structure design work of No.3 and No.4 Tower. My work included: to establish the calculation model for
文档评论(0)