[交通运输]航班延误与时刻设计.pptVIP

  1. 1、本文档共50页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
[交通运输]航班延误与时刻设计

10/13/2002 Robust Aircraft Maintenance Routing New Approaches to Improving the Robustness of Airline Schedules Prof. John-Paul Clarke Department of Aeronautics Astronautics Massachusetts Institute of Technology Outline Background Motivation Robust Maintenance Routing Flight Schedule Re-Timing Degradable Airline Schedule Conclusions Airline Schedule Planning Process Most existing airline schedule planning methods assume that aircraft, crews, and passengers will operate as planned Airline Operations Bad weather reduces airport capacity Airlines cancel or delay flights to reduce demand Delays propagate through the network Airlines must reschedule aircraft/crew and re-accommodate passengers Passengers are not satisfied They are delayed They have no control over their delay All passengers on a given aircraft are delayed equally regardless of fare class Delays Cancellations Trend (1995-1999) Significant increase (100%) in flights delayed more than 45 min Significant increase (500%) in the number of cancelled flights Year 2000 30% of flights delayed 3.5% of flights (approx. 140,000) cancelled Future: Delays and cancellations may increase dramatically ? more frequent and serious schedule disruptions and revenue loss Passenger Disruptions Flight delays and cancellations often cause passenger schedule disruptions 26 million passengers (4% of passengers) disrupted 65% of disruptions caused by missed connections Very long delays for disrupted passengers Average delay for disrupted passengers is approx. 4 hours (versus 15 min delay for non-disrupted passengers) Significant revenue loss - approx. $4 Billion /year Robustness Need schedules that are robust (insensitive) to delays and cancellations Definitions of robustness Minimize cost (expected/worst case deviations from optimal) Minimize aircraft/passenger delays and disruptions Easy to recover (aircraft, crew, passenger) Isolate disruptions and reduce the downstream impact Two ways to provide robustness Re-optimi

文档评论(0)

qiwqpu54 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档