伟世通分层审核培训资料资料.ppt

  1. 1、本文档共49页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
伟世通分层审核培训资料资料

LPA Training Revision 2 (February 2007) * PLAN策划 Form a team to develop the checklist 组成工作小组制定计划 The team shall be Cross Functional : 工作小组成员来自以下职能部门: Manufacturing, Quality, Engineering, Maintenance, etc… 生产、质量、工程、维护….等 The team shall be multi-level: 工作小组成员应来自各个层面: Managers, Supervisors, Inspectors, Operators 经理、主管、审核员、操作工 LPA Training Revision 2 (February 2007) * 1st Layer of Management LPA Checklist LPA检查清单管理第一层次 ? Yes是 No非 N/A Immediate Reaction迅速的反应计划 Date Closed关闭日期 Plant Specific Issues:工厂重点关注: ? ? ? ? ? ? ? ? ? ? ? Is Assembly Operator at Station 30 crimping part properly? (example) ? ? ? ? ? ?装配操作工在第30工序的卷边操作是正确的吗?(举例) ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? Process/Operator Checks:过程操作工检查: ? ? ? ? ? Are Operators following posted work Instructions at all stations? ? ? ? ? ? Are all operators following the process flow? ? ? ? ? Is the process following the Control plan? ? ? ? ? Are control plan checks being followed? ? ? ? ? Is the control plan linked to the PFMEA and Flow Chart and vice versa? ? ? ? ? Are the operators aware of Quality Alerts? ? ? ? ? Are Quality Alerts easily identified? ? ? ? ? Is the Quality Alert current? (Expiration date -30 days) ? ? ? ? Is Versatility/Training Matrix current? (Check All) ? ? ? ? Are all operators trained to perform the job they are doing per vers matrix? ? ? ? ? HOUSEKEEPING:事务 ? ? ? ? ? ? ? ? ? ? ? Are parts in their proper location? (In process or work in progress) ? ? ? ? ? Are operators working at the proper line speed (not ahead)? ? ? ? ? Are purchase parts at the area appropriately labeled and in their own containers so as not to cause mixed/wrong stock? ? ? ? ? Are there “spare fasteners” lying on the floor? (Possibly indicating a process/engineering problem and which may also lead to “bonus parts”) ? ? ? ? Are nonconforming parts tagged? ? ? ? ? Is the repair area clean and organized with minimal repairs and scrap? ? ? ? ? Are end items in their proper storage locations? ? ? ? ? TEAM B

文档评论(0)

aena45 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档