- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Cycle Issues in the TP+ Area在TP +地区周期问题.ppt
Cycle Issues in the TP+ Area 14 October 2010 Bicycle User Group Meeting Issue #1:Confusion regarding access to King’s Hedges Rd from the SP gate via the Guided Busway Response: Once the Guided Busway is fully built and the cycle path paved, gaining access to King’s Hedges Road will be easier and more straightforward Issues #2: Back gate to SP are closed during nights and weekends Response: Due to security and requests from companies on the area, this gate has to be closed at nights and weekends. Issue #3: There are a lot of potholes and broken glass For potholes, please report them to Cambridgeshire Highways at 0345 0455 212 or online at .uk/forms/highway_defect.htm. For broken glass, please call either Cambridge City Council at 01223 458 282 or S Cambridge District Council at 01954 212024 Issue #4: People may not want to cycle because of punctures or break down The Environmental Transport Association provides roadside pick-up for bikes. Please visit www.eta.co.uk or attend the TP+ bike maintenance courses in November Issue #5: Why isn’t the kerb lowered near the overflow car park leading from the Milton Road gate cycle entrance Response: The requested site for the lowered kerb is adjacent to where cars exit the car park. A barrier and detour was put into place to prevent accidental collision Issue #6: Kerbs and Shrubs are too high Response: please inform TP+ of the exact location and the information will be reported to Bidwells for possible action Issue #7: Phasing of traffic lights to Milton road Response: The detector loops for the right turn lane will be re-cut and extended to the red, cyclist designated section of the lane. Any other issues, please call CCC 0800 253 529 Issue #8: Cobble stones on entrance to raised traffic calming area near RSC are uncomfortable Response: Bidwells has been informed of this uncomfortable section of the road. Issue #9: T junction near Broadcom and Kudos is dangerous to cyclists Response: Bidwel
您可能关注的文档
- 中原首辅2012高考一轮英语(北师大版)教师课件:Module 4(必修2 Unit 6).ppt
- 知识员工激励机制设计[最牛员工激励理论].ppt
- 2012《师说》系列一轮复习(理科数学)《空间几何体的表面积和体积》(人教B版).ppt
- 高一语文必修1课件:奇妙的对联(新人教版)(孙逸豪推荐).ppt
- 语文:《乌鸦喝水》.ppt
- 初中作文教学中语文教师的角色定位[打造高绩效团队].ppt
- Computer Science - Kent State University Undergraduate and 肯特州立大学计算机科学本科和.ppt
- 高中生物 第二章皮肤课件.ppt
- DATA MANAGEMENT - San Jose State University数据管理-圣何塞州立大学.ppt
- 榆林学院化学与化工学院工程制图课件第十一章 计算机绘图和autocad基础.ppt
- 01 MCS-51系列单片机.ppt
- 工作分析-操作流程与方法【员工及安全管理】.ppt
- lesson16征服嵌入式系列视频教程之51篇.ppt
- aab_做好工作计划【应用文书例稿】.ppt
- ★房地产基础知识 培训【企业广告传媒】.ppt
- Modeling Peak Width建模峰宽度.ppt
- 第二章工作分析_人力资源.ppt
- 2012届高考复习政治课件(人教山西用)必修2第3单元第6课第2课时 中国共产党:以人为本 执政为民.ppt
- 六数理统计的基本概念人文科技【统计学经典】.ppt
- Financial Coaching for Prosperity Training for Frontline Staff对一线员工的培训教练繁荣金融.ppt
文档评论(0)