- 1、本文档共112页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Software Project Management Rational Unified Framework软件项目管理的统一框架.ppt
Software Project Management Walker Royce Software Project ManagementRational Unified Framework Bojana Mila?inovi? bojana@rti7020.etf.bg.ac.yu Ivanka Milenkovi? vanjaaaa@ Veljko Milutinovi? vm@etf.bg.ac.yu Part 1 Software Management RenaissanceIntroduction In the past ten years, typical goals in the software process improvement of several companies are to achieve a 2x, 3x, or 10x increase in productivity, quality, time to market, or some combination of all three, where x corresponds to how well the company does now. The funny thing is that many of these organizations have no idea what x is, in objective terms. Part 1 Software Management Renaissance Part 1Software Management RenaissanceTable of Contents (1) The Old Way (Conventional SPM) The Waterfall Model Conventional Software Management Performance Evolution of Software Economics Software Economics Pragmatic Software Cost Estimation Part 1 Software Management RenaissanceTable of Contents (2) Improving Software Economics Reducing Software Product Size Improving Software Processes Improving Team Effectiveness Improving Automation through Software Environments Achieving Required Quality Peer Inspections: A Pragmatic View The Old Way and the New The Principles of Conventional Software Engineering The Principles of Modern Software Management Transitioning to an Iterative Process The Old Way Part 1 The Old Way Software crisis “The best thing about software is its flexibility” It can be programmed to do almost anything. “The worst thing about software is also its flexibility” The “almost anything ” characteristic has made it difficult to plan, monitor, and control software development. Part 1 The Old WayThe Waterfall Model Drawbacks Protracted integration and late design breakage Late risk resolution Requirements - driven functional decomposition Adversarial stakeholder relationships Focus on document and review meetings Part 1 The Old Way Conventional Software Management Performance Fin
您可能关注的文档
- 五年级语文上册 小麻雀 4课件 语文S版.ppt
- 企业福利研究【内部精华】.ppt
- National Incident Management System - SIS - Reliable 国家事故管理系统是可靠的.ppt
- 2012年《随堂优化训练》历史必修三 岳麓理科 第六单元 第29课 百花齐放 百家争鸣 :精品课件.ppt
- 现代汉语第五章语法之二短语.ppt
- Emitted AntiNeutrino Spectra for Different Reactor Burn 发射的中微子能谱不同的燃烧反应器.ppt
- 建筑定额__工程造价.ppt
- Consumer Choice消费者的选择.ppt
- Cycle Issues in the TP+ Area在TP +地区周期问题.ppt
- 01 MCS-51系列单片机.ppt
最近下载
- 《公路工程施工安全技术规范》(F90-2015 )【可编辑】.docx VIP
- 乙型肝炎病毒标志物临床应用专家共识(2023)解读PPT课件.pptx VIP
- 【基于绝对估值法和相对估值法的上海来伊份公司投资价值估算实例5700字】.docx
- 九宫格数独题目(打印版).docx VIP
- 内蒙古开放大学2024年秋季学期期末考试《铸牢中华民族共同体意识》试题B(开卷).pdf VIP
- 中国建筑加固工程行业发展分析与发展趋势预测研究报告2025-2028版.docx
- 17.3.1 一次函数 课件(共26张PPT)(含音频+视频).pptx VIP
- 附件4:麻醉疼痛诊疗中心评审实施细则(2024年修订版).docx VIP
- 低空经济数字化转型与数字客运解决方案.pptx VIP
- 说明书 水库动态监管预警系统使用说明书.doc VIP
文档评论(0)