- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ppap motorola training(ppap摩托罗拉培训资料)
By: Zubair Iqbal By: Zubair Iqbal The intent of this training is to communicate Motorola’s, PPAP requirements to the suppliers and train the SDE Engineers and suppliers on these PPAP requirements for qualification What does PPAP stand for ?? Is Motorola changing the qualification requirements ?? Motorola is not changing qualification requirements, instead Motorola is enhancing/adding the current qualification requirements to match the PPAP requirements. (1) Design Records (2) Engineering Change Documents (if any) (3) Customer Engineering Approval (If required) (4) Design FMEA (6) Process FMEA (7) Dimensional Results (8) Material, Performance Test Results Material, Performance Test Results: Material tests are test that specified on Motorola print or specifications as chemical, physical or metallurgical tests e.g. MEK, abrasion, adhesion, ……etc. Performance tests are test that specified on Motorola print or specifications as performance tests e.g. number of cycles, environmental testing, electrical testing, Plating thickness, Paint thickness, Gloss readings, ……etc. (9) Initial Process Studies (11) Qualified Laboratory Documentation (12) Control plan (13) Part Submission Warrant (14) Appearance Approval Report (15) Bulk Material Requirements Checklist (16) Sample production Parts (17) Master Sample (18) Record of Compliance With customer specific Requirements (19) Checking Aids (20) Run at Rated Speed How many of the PPAP requirements will be required for qualification and which ones ? MOT PPAP REQUIREMENTS So as a supplier, what should I submit for qualification? Following items need to be submitted for Motorola qualification requirements. Supplier may need to submit additional requirements based on the specific commodity. Refer to your local SDE or CTE for additional requirements for a specific commodity. Design Records Process Flow Diagram Process FMEA Dimensional Results Material performance Test Results Initial Process Studies M
文档评论(0)