项目管理_-英文版.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
项目管理_-英文版

Project Management ASSESSMENT PROJECT: Whether BIM will shake the status of the project manager STUDENT: LV LEI ASSESSMENT CRITERIA: % MARK Content Critical Analysis Structure and Presentation Referencing 40 30 15 15 CHECKLIST OF SPECIFIC ATTRIBUTES Quality of advice/assembly of data: Excellent Good Satisfactory Room for improvement Poor Clarity of argument/recommendation: Excellent Good Satisfactory Room for improvement Poor Structure of assignment: Excellent Good Satisfactory Room for improvement Poor Presentation: Excellent Good Satisfactory Room for improvement Poor ASSESSORS COMMENTS/FEEDBACK: Please discuss any queries with your tutor ASSESSOR: DATE: Whether BIM will shake the status of the project manager 1 Introduction In recent years, BIM (Building Information Modeling) has been widely used in the field of construction and achieved good results, which has an impact in many aspects of project management and also put forward some new requirements for the abilities and training methods of the project manager. The article analyses the application and development of BIM, the occupational characteristics of the project manager firstly, and then analyses the question that whether BIM will shake the position of the project manager or not, and gives the answer finally. 2 The application and development of BIM BIM (Building Information Modeling) is the related detailed expression of the project based on the foundation of three dimensional digital technologies and the construction data model of the relevant information of construction engineering project. The application of BIM is used to solve the problem of description in the construction work, is the foundation for designer and engineering technical personnel to responding to a variety of architectural information and working together. BIM is the digital method used in design, construction and management, this method supports the integrated management environment of construction eng

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档