- 1、本文档共56页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
FIDIC-菲迪克1987年版(英)
PART I - GENERAL CONDITIONS of CONTRACT 7
Definitions and Interpretation 7
1.1 Definitions 7
1.2 Headings and Marginal Notes 8
1.3 Interpretation 8
1.4 Singular and Plural 8
1.5 Notices, Consents, Approvals, Certificates and Determinations 8
Engineer and Engineers Representative 9
2.1 Engineers Duties and Authority 9
2.2 Engineers Representative 9
2.3 Engineers Authority to Delegate 9
2.4 Appointment of Assistants 9
2.5 Instructions in Writing 9
2.6 Engineer to Act impartially 10
Assignment and Subcontracting 11
3.1 Assignment of Contract 11
4.1 Subcontracting 11
4.2 Assignment of Subcontractors Obligations 11
Contract Documents 12
5.1 Language/s and Law 12
5.2 Priority of Contract Documents 12
6.1 Custody and Supply of Drawings and Documents 12
6.2 One of Copy of Drawings to be Kept on Site 12
6.3 Disruption of Progress 12
6.4 Delays and Cost of Delay of Drawings 13
6.5 Failure by Contractor to Submit Drawings 13
7.1 Supplementary Drawings and Instructions 13
7.2 Permanent Works Designed by Contractor 13
7.3 Responsibility Unaffected by Approval 13
General Obligations 14
8.1 Contractors General Responsibilities 14
8.2 Site Operations and Methods of Construction 14
9.1 Contract Agreement 14
10.1 Performance Security 14
10.2 Period of Validity of Performance Security 14
10.3 Claims under Performance Security 14
11.1 Inspection of Site 14
12.1 Sufficiency of Tender 15
12.2 Adverse Physical Obstructions or Conditions 15
13.1 Work to be in Accordance with Contract 15
14.1 Programme to be Submitted 15
14.2 Revised Programme 16
14.3 Cash Flow Estimate to be Submitted 16
14.4 Contractor not Relieved of Duties or Responsibilities 16
15.1 Contractors Superintendence 16
16.1 Contractors Employees 16
16.2 Engineer at Liberty to Object 16
17.1 Setting-out 17
18.1 Boreholes and Exploratory Excavation 17
19.1 Safety, Security and Protection of the Environment 17
19.2 Employer’s Responsibilities 17
20.1 Care of Works 18
20.2 Responsibility to Rectify Loss or Damage 18
20.3 Loss or
您可能关注的文档
- CN 03105281.9 注射用藻酸双酯钠及其制备方法.pdf
- CN1201446-二氟甲烷的制备方法.pdf
- ColdFusion-初级培训教材.pdf
- Core-Structure-of-Intracluster-Gas:Isothermal-Hydrostatic-Equilibrium.pdf
- Cosmology-in-three-dimensions:steps-towards-the-general-solution.pdf
- CRIC信息服务2010年7月刊市场月报缩略版.pdf
- Cross-correlation-of-Lyman-α-absorbers-with-gas-rich-galaxies.pdf
- CUMULANTS-IN-NONCOMMUTATIVE-PROBABILITY-THEORY-IV-NONCROSSING-CUMULANTS-DE-FINETTI’S-THEOREM,Lp-INEQUALITIES-AND-BRILLINGER’S-FORMULA.pdf
- Dark-matter-annihilation-from-intermediate-mass-black-holes:Contribution-to-the-extragalactic-gamma-ray-background.pdf
- Dark-Solitons-in-F-=-1-Spinor-Bose–Einstein-Condensate.pdf
文档评论(0)