ABB IEC61850介绍(英文).pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Interoperability with IEC 61850 Support for IEC 61850 IEC 61850 Interoperability in two phases Schedule of activities What is GOOSE? IEC 61850 GOOSE Principle Test configuration of phase 1 Substation Configuration Language (SCL) Tripping via GOOSE Negative tests Positive tests Performance tests: Background traffic Performance tests: Device load Phase 1: Performance tests Interoperability test concept Test results A week of successful work Conclusion * INTEROPERABILITY Tests IOP11/2002 * IEC 61850 IEC 61850 INTEROPERABILITY BETWEEN ABB, ALSTOM and SIEMENS STATUS REVIEW November 2002 IEC 61850 the global standard for communication in substations ABB, Alstom and Siemens (A-A-S) are deeply engaged in the elaboration of the IEC 61850 standard. Each of these companies will implement IEC61850 in its power automation products and systems. A roadmap for the staged implementation of IEC 61850 has been defined in line with the progress of the standard. To verify the implementation of IEC61850 of all three suppliers, joint interoperability tests have been specified. The first test step has now been completed successfully. Specification level Phase 1 (P1): Basic functions GOOSE* Phase 2 (P2): Advanced functions Best practice used for the implementation with respect to the standard. Phase1 Phase 2 Typical functions of a substation automation system *GOOSE: Generic Object Oriented Substation Event The way to interoperable substation automation 2002 2003 2004 2001 2000 2002 2003 2004 2001 2000 Further interoperability tests Test P2a Test P1 First interoperability tests of bay devices Committee draft Final draft International Standard International Standard Committee draft for vote Kickoff IEC 61850 IEC A-A-S Test P2b GOOSE (Generic Object Oriented Substation Event) It is a mechanism for the fast transmission of substation events, such as commands, alarms, indications, as messages A single GOOSE message sent by an IED *

文档评论(0)

好文精选 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档