建设工程合同管理中变更与索赔分析——以大渡河黄金坪水电工程为例-analysis of changes and claims in contract management of construction projects - a case study of jinding hydropower project in dadu river.docxVIP

建设工程合同管理中变更与索赔分析——以大渡河黄金坪水电工程为例-analysis of changes and claims in contract management of construction projects - a case study of jinding hydropower project in dadu river.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建设工程合同管理中变更与索赔分析——以大渡河黄金坪水电工程为例-analysis of changes and claims in contract management of construction projects - a case study of jinding hydropower project in dadu river

万方数据 万方数据 Abstract In construction project, because of designing the defect, the construction contract one is not complete, accessory risk, predictability, build the intersection of management mode and change, the intersection of performance and the intersection of person who do ones best and various uncertain factors of construction contract of environment, project alteration and appearance of project claim are often inevitable. On one hand, will upset the normal homework order in the frequently appearing of project alteration, cause the increase of project investment of the project, progress management is out-of-balance, the risk of personnel of the project, manage the risk and increase of quality risk while constructing, initiate contract dispute and dispute finally. On the other hand, the contractor, in order to make the victory of competitive bidding, has undertaken more risks. Also assumed the risk that a lot of owners shift over sometimes. In order to reduce the losses that these risks bring, the contractor has to remedy the deficit of the cost positively by project alteration and claim then realizes its economic benefits. This paper regards construction project and contract management and variation and claim as the research object. Above the foundation that is described to the current situation of domestic and foreign construction project and variation and claim, pass the comparative project variation and claims concept. We have stressed the project variation and claim manages the difference present and gets in touch. Regard this as the breakthrough point, the groundwork herein is as follows: First, the alteration of building the construction contract while managing plays chess and analyzes with the claim. On the categorized foundations of network analysis project alteration of this text and claim management, consider that carries on many stages and plays chess to analyze with the owner to the unit in charge of construction under the asymmetrical terms of in