- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2006年香港理工大学、日本大阪大学和韩国首尔大学WORKSHOP时做关于建筑科学汇报PPT
1. Introduction We are attend this workshop to study about architectural method and construction management which is applied for high rise building, especially Seocho-project. By the survey of the site and the interview with an expert, we were dealed with the typical and detailed matters related to high rise building. Moreover, we debated with each other and we deduced a satisfactory conclusion about a point of sameness and difference of the construction management between Hong-Kong and Korea Quality Management Contractors with ISO 9000 certification (HK) - 1 Public works boards and committees (HK, KR) Contractors in Group A, B, and C (HK, KR) A sub-contracting system (HK, KR) List of Approved Contractors for Public Works (HK, KR) List of Approved Suppliers of Materials and Specialist Contractors for Public Works (HK, KR) Parties involved in Quality Management (Clients, agents, QS, architects, main contractors, sub-contractors, etc.) (HK, KR) Two grades for quality management: PASS and NOT PASS. (HK) - 2 A complete quality insurance system consists of: (HK, KR) 1. A unified factory-based structural components 2. The inspection of project sites and site safety 3. Authorized persons, registered engineers and contractors. Cost Management Activities of cost control should be conducted throughout the whole process of construction (Total Cost Management), because ill construction quality and frequent rebuilding activities lead to the increase in construction cost and work delay as well. (HK, KR) Project undertakers are required to bear in mind cost consciousness. Even a piece of paper is not permitted to be wasted. (HK, KR) For the cost control of materials and subcontract, main contractors normally provide materials to project sites subject to quantity, types, and arrival time. (HK, KR) A list of qualified contractors and suppliers are created and renewed regularly for the control of material purchase. (HK, KR
您可能关注的文档
- 1.3.1有理数加法第1课时.ppt
- 1.划时代发现.ppt
- 1.电路基本概念与基本定义—习题课.ppt
- 1.5函数y=Asin(x φ)图象1.ppt
- 1.5三角形全等判定.doc
- 1.2直角三角形判定.doc
- 100个著名管理定律.doc
- 10.0+英汉语篇衔接、连贯与翻译.ppt
- 10KV变电所研究和设计.doc
- 10kV小型变电站系统设计.doc
- 2010中考物理试题分类汇编(93套)专题2光传播、光反射、平面镜成像.doc
- 2010中考物理试题分类汇编(93套)专题十六运动、长度和时间测量 力.doc
- 18新古典主义时期工艺美术.ppt
- 2009年国外大型房企业务发展模式探讨以及对复地集团启示.ppt
- 2010中考物理试题分类汇编-----能及能转化和守恒.doc
- 2009届高考生物遗传细胞基础考点预测.doc
- 2010届高考一轮复习精品题库六:生物变异与进化.doc
- 2010上半年重庆地产平面广告整理:由重庆日报收集,整理整个重庆市报广,最难能可贵是 还有评论和分析.ppt
- 2010中建枣园项目策略案:逻辑严谨竞标策略全案.ppt
- 2010年8月8日考试湖北省高校教师岗前培训高等教育学模拟试题及答案.doc
文档评论(0)